ATOMIC ENERGY COMMISS/ON
SANTA’ FE OPERATIONS OFFICE

SFO. 430

13. 50}

COMPLETION REPORT FOR

AS- BUILT DRAWING NUMBERS AND DATES:

JOB NO. 789 = 3

34-690 - L/2/51

CONTRACT NO. _AT-(29~1}-507
For:

30-077 - L/2/51

sHeeT wo. 34or

Soa

LOCATION

"Not for use by A-E

BMTWEEOK ATOLL

DATE OF THIS REPORT:
2
il 2
“r
ted

The Complete Construction of Booed Building
Huiiding No,:

Station TTS
ESTIMATE

Sy

"Property
Account

-

ae

DESCRIPTION OF PROPERTY UNITS

Number

Quantity

Unit

Construction
Contract
Cost

Est'd. Value
Gov. Furnished
Material

Engi
Agi neering
Cost

*Proration of

Total

Charges to Units

AFOAT- REQUIRED CONSTRUCTION AND LOCATIONS OF THE FOLLOWING STATIONS:

STATION 775, SITE "A"
A one-story, flat roof, wood building, aise 0.D, 10'-O" x 10'-0" x 7'-8" high,
eet on a continuous reinforced concrete foundation.

A masse concrete blook sise

5'-0" x 5'-0" x 6'=6" ig installed in center of floor area and extends from bed
rook to floor level and is separated from building foundation by compacted sand
f111. Walle and roof are covered with mopped-on roofing felt. Laminated wood
Goor, light proof slosure, is covered with mopped-on roofing felt. Complete
with eleotrio wiring end fixtures, floor area 0.D. 100 square feet.

1

each
Direct

Indir ect

:

fase

55

$ 1.8

$

44.02

CAUI
aa

t

dorumen: contain

Natlomal | 4 4ense of

trinpenleniok on te et
Oy Manne ie Be

5
J

ings

turited ont May ott

altiey cette apore ot

Select target paragraph3