ty

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$FO. 436

{3. 90)

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:

2B—

2/24/51

7B

ope

ia

eke

2B430

2/24/51

2B-5324

2B-340 2/2h/51

—~—
"Property
Account

JOB NO.

2/2u/51

640 - ld

28-5157 2/24/51

S

CONTRACT NO, 29-15-5097
For:

eater

18

68

sHeeT wo. 19 ofOF
LOCATION

“Not for use by aeneee u7

PARRY ISLAND - SITE "B"

&

16

DATE OF THIS REPORT:

The Complete Construction of H & N Administration Building

2h February ary 1951

Bultding No.: 208

2/24/51

ESTIMATE

Quantity

DESCRIPTION OF PROPERTY UNITS

Unit

Construction
Contract

Est'd. Value

Goveoral shed

Engineering
Coat

.

Total

H_& N ADMINISTRATION BUILDING
This ie a one story, double roofed, prefabricated aluminum building erected on a

S*® concrete slab, size 176'-3/h" x 25'-2" and an East wing 102'-6 1/2" x 25'-2",
total floor area, 7,050 square feet, complete with electric wiring and fixtures,
fresh and salt water plumbing, telephone installations, storage hot locker and
an adjoining reinforced concrete vault, sise O.D. 9'=-0" x 12'-10 1/2" x 9'-0"

high with 6" floor slab end foundation, telephone exchange and dehumidification
equipment.
Installed equipment includes: Three water coolers with drinking fountains, two
clocks, ona blue print machine, and a blue print cabinet.

1

Each

Direct

Indirect

SOP

$55,678.05

27,002.51

$1,126.82

$84,407.38

*Prorati

'

Chargesfonto Oo Units

4

Select target paragraph3