AS-HUIL T

COMPLETION REPORT FOR
CHAWING NUMBERS

CONTRACT NO.

JOU NU. FY = 2

ANT) DATES:

For:

ATR (29-1 1-50?

The Complete Construction o '
Building No

eee

“Property
Accuunt
Number

|

LESCRIPTION OF

wee

"Not

tor

LOCATION

GATE

OF

Bniwetok Atoll

LF oo Flo
use

+

thy

2 April 1951

Yeutron Hemi sphere

Pog fee er ey

Total

ratst
ee

LD 50 REQUIRED CONSTRUCTION aND LOCATION OF THE FOLLOWDMG STATIONS - CONT.
MWEUTRON HEMISPHERE STATIONS 7le THRU h, SITE "D-¥"
end installed by Holme, 4 Narver,.

Equipment furnished by user

Bach
Direct
Indtreot

$321 047

384-2h,

$10.93

$716.64

$lo .88

$716.48

gio.as

$716.45

WEOTROW HEMISPHERE STATIONS 7ie THRU h, SITB *&”
Roumd hole in ground, sise 4'-0" dia. x 4'-0" deep,
user and installed by Holmes and Narver

fF

—r-

at

Round bole in ground ,'-0" dia. x 4'-0" deep.

A~E

THIS REPORT:

Stetions 73a thru h, 7h thru h

Quantity

PROPERTY UNITS

:

sHeeT wo

S qe.

Equipment furnished by
Direot

Indirect

WEUTRON HEMISPHERE STATIONS Jie THRU h, SITR *C"
Asourately loeated hole in the ground, i'-0" diameter x l,'-0" deep, Hemisphere
and pipe support to be furnished by user and set by Holms & Narver.
Direot

Indirect

engin 7

ay
.
Proration of
Charges to Unit