ATOMIC
434

ta

TS 50)

+

AS-BU1LT DRAWING NUMBERS ANO DATES:

481358
481359

SAWTA

9

ENERGY

For:
or

COMMISSION

OPERATIONS

OFFICE

COMPLETION REPORT FOR

.
CONTRACT NO.

JOB NO. T3H.2-9e

2/6/51
2/6/61

FE

AT-(29-1)-507

The e Complete
Complete Constructi
Construction
Building No.:

sHeet wo.

Selenksabchieal
LOCATION

of

Mevy

Type

EMGEBL - SITE *K*"

,

@

or28

"Not for use by A-E
pare OF THIS nero:
February

Structure

3e2.6
ESTIMATE

property. -

a

Recount

ee

ee eeeee

a

DESCRIPTION OF PROPERTY UNITS

Ba en ee

Quantity

Unit

Construction
Contract

Est'd. Value

COM een ehed

Engineering
Cost

Total

—_—

TEST STRUCTURE 32206
A reinforced concrete test structure, dome shape of precast panels, mected

on s 6" floor aleb foundation mith 2'-3* thick footings. The size of the
structure, spherical radius, I.D. 2'-0" free center is li'-0" giving a height

of 14'-O" x 32'~0" diameter.

Two sloping wing walle 6" thick extend 1h'-0#

from concrete entrance walls and roof, and provide unobstructed entrance te
the earth covered structare.

1

each
Direct

Indirect}
Instrusentation

Total Structare and Instrwentation

Direct

$1h, 946.12

8,151.95

4,617.66

-Q0-

$23,098.06

Indirect}

, 768.39

$1,622.66

11,198.71

Direct
Indirect;

19,563.77
12,920.3h

1,812.66

3h, 296.77

i
|

CAU]

oT his doevumen
tnreacuonal Te

|

aa

(rposmitivo ort

*Prorati

ion

oO

'

Charges to Units

Select target paragraph3