ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

‘

Shue ada

—
HTT pe SAT
erste

uy

481349

2/6/51

481350

\*

AN

OAT

JOK NO. 730.2090 & f
For:

=“>ireae

CONTRACT ND, ATatdni baoOT

(uc aT+iON ESGEBI - SITE "Eg"

The complete Construction of

Builaing NO.:

Meya

BE

be net
- int
Nome.
vmeee

COMPLETION REPORT FOR

(Es RIPTION OF

-

\

see

PROFERTY UNITS

_

Oo

ee

"NOL for use hy Act
WATE

unit

wae

Thel o REPORT,

er

a
hte Satue “ae,
astra tor Phat
naifee ring
tov. burnished

a ee

wt

6 February 1951

avy Type Strusture

3,2.2— and b

Quantity

of 8

SHEFT NO _ y

ede

conteaut
uot
- -

—4-

Material
Ke ee

Hu
fee

Total
ee

“Proration of
Cha ryes

ae

BUILDING 2e2e28

A conorete test structure, size 21'-2" x h1'-0" x 11'-6" with reinforced preoast
panels and columns, assembled with bolts and welded steel plated, anohored to a
reinforoed foundation and footings 3'-6" thick below grade.
_

|
1

each

Direst
Indirect

I

Inetrumentation
|

Dir eot

Indir ect

Total Structure and Instrumentation

Direct

Indirect

|

$14,587.59
begn.co
5,ees

4,

20,472.75

12,749.12

-O-

$21,282 .68

$2,321 47

14,260 .66

2,321 24,7

35543.34

-0O-

32,565.91

1,773.79

9,729.93

1,773.75

42,295.68)

BUILD ING 3.2.2
.
;
1

A concrete and brick test structure, sise 211-6" x 3'-6" = 11'-0", with
reinforoed precast concrete panels bolted to brick walls and a flat wood frans
roof, anchored to reinforced foundation and footings 3'-0" below grade,

|

1

each

Direct

Indireot

|
Ingtrumentation
fotel Structure and Instrumentation

21, 767 2

10,798 49

Direct

3,966.33

Direot

25, 733675

Indi re ot
Indirect

3,989.85

14,788.34

to

a

tnits

Select target paragraph3