,

SFO. 430

(3. 80)

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

AS- BUILT DRAWING NUMBERS AND OATES:
oleae

JOB NO,

Rio

640 - 3s

CONTRACT NO. 29-1
For:

The Complete Construction of

Building No.:

LOCATION

DATE OF

Infirmary

9 Dec

THIS REPORT:

F 1950

52

"Property

DESCRIPTION OF PROPERTY UNITS

AG or_29

*Not for use by a-E

JAPTAN ISLAND ~ SITE "L"

_

Account

SHEET No.

PORT T

COMPLETION REPORT FOR

Quantity

Unit

ESTIMATE

Construction

Contract

Est'd.

Value

OOMeta

Engineering

Cost

Total

-—

INFIRMARY
Qne story frame construction; roof and siding corrugated alusinus; rectangular

ahape; sise 1.D. 19'=11 U/" x 23'21 1/k" x 12'=0", set on a 5" reinforced

concrete slab.

Includes electrical wiring, plumbing, storage cabinets, bench,

ahelving, screened doors and windows.

Floor area 0.D. 507 aq. ft., cubic content

I.D. 4,773 cu. ft., concrete pads, 5" thick, 4'-O" x 10'-O" and 4'-0" x 5'-08,
total 60 sq. ‘, Installed equipment and furniture includes: One glass instrument cabinet, one 16" x 33" metal table, one operating table, one fire extinquisher, and one refrigerator.

1

Each
Direct

Indirect

$5,385.37

4,671.83

oe

$10,057.20

*Proration of

Charges to Units

Select target paragraph3