a SFO.43 0 (3. 80} ATOMIC ENERGY COMMISSION SANTA FE ‘OPERATIONS OFFICE COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS AND DATES: 2L-020 12/15/50 2L-489 12/15/50 2L-986 12/15/50 2L-987 12/15/50 21-988 12/15/50 21-990 JOB NO. 640 - 3f 12/15/50 FS~4.72 shh1/51 “Property Account CONTRACT NO, For: SHEET NO. Bullding No.: Revised: 7 May 1952 ESTIMATE Unit Constructlon Contract Cost Est'd. Gov. Value Furnished Materiai Engl neering Cast Total LABORATORY BUILDDIG Qne story, double roof, prefabricated aluginus construction; rectangular shape} consists of two parallel buildings joined by 6'-10" covered passage; each building 24'-O" x 72'=8 1/2" x 12'-08 I.D.3; anohor bolted to a 5" thiek concrete slab, size 0.D. 56-0" x 73'=10 1/2"; shed type sheet aluminum roof over passage provides longitudinal gutter between buildings; vented window panels screened; saluzinum pertitions separating 11 rooms; doors at each end of passageway; with lignting and power wiring and fixtures; plumbing; telephone installations dehumidification equipment; dark room sealed for humidity control; leboratories are equipped with wooden shelves, benches, and countersj linoleum and plyglase covered benches include 12 stainless steel sinks; sleb area 0.D. 4,135 square feet; cubis content inoluding passageway 38,500 cubic feet. Direct Indirect $47,911.23 32,912.60 or_J DATE OF THIS REPORT: 15 December 1950 12 Quantity 8 *Not for use by A-E LOCATION JAPTAM ISLAND - SITE "L" Tne Complete Construction of Laboratory Building DESCRIPTION OF PROPERTY UNITS Number AT~( 29-1 }-507 See $779 43 $81,603.26 CA “This document phe Nationat Lets, *Proration of Charges to Units