ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 436
(3. %)

Sp...

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
2B-L06-3

2B-113-3

12/15/50
12/15/50

3p7-29

ei

2B-402-3

12/15/50

JOB NO,

640 = 3a

CONTRACT NO.
For:

The Complete Construction of

a

15 December 1950

36 Man quarters

&

Quantity

DESCRIPTION OF PROPERTY UNITS

Unit

Construction
Contract

Est'd. Value

GON een shed

En

.

gineering
Cost

Total

26 Ma QUARTERS
This is a one story, double roofed, prefabricated aluminum building erected on a
eoncrete slab, complete with electrical wiring and fixtures, fresn and salt water

Plumbing, telephone installation, and aluminum partitions providing nine (9)
rooms, toilet and showers, corridor end vestibule. The aise 1.D. is 2l'-0" x
128'=8 1/2" x 10'=0" mean height. The total floor area of this building is

3,268 square feet and the cubic sontent is 30,890 cubic feet.

ment ineludes:

OF

ESTIMATE

"Property
Account

3

DATE OF THIS REPORT:

LOCATION JAPTAN ISLAND = SITR *L*

AT-( 29-1 3-507

Building No.:

SHEET NO.

"Not for use by AvE

One water cooler with drinking fountain.

Installed equip-

1

ach
Tadtewet
Indiree

$22,048.57
8, 98.92

$560.10

$31,557.58

he National {
FansMaaben +

.

Prorati to Unite
f
Charges