ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 436
(3. %)
Sp...
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2B-L06-3
2B-113-3
12/15/50
12/15/50
3p7-29
ei
2B-402-3
12/15/50
JOB NO,
640 = 3a
CONTRACT NO.
For:
The Complete Construction of
a
15 December 1950
36 Man quarters
&
Quantity
DESCRIPTION OF PROPERTY UNITS
Unit
Construction
Contract
Est'd. Value
GON een shed
En
.
gineering
Cost
Total
26 Ma QUARTERS
This is a one story, double roofed, prefabricated aluminum building erected on a
eoncrete slab, complete with electrical wiring and fixtures, fresn and salt water
Plumbing, telephone installation, and aluminum partitions providing nine (9)
rooms, toilet and showers, corridor end vestibule. The aise 1.D. is 2l'-0" x
128'=8 1/2" x 10'=0" mean height. The total floor area of this building is
3,268 square feet and the cubic sontent is 30,890 cubic feet.
ment ineludes:
OF
ESTIMATE
"Property
Account
3
DATE OF THIS REPORT:
LOCATION JAPTAN ISLAND = SITR *L*
AT-( 29-1 3-507
Building No.:
SHEET NO.
"Not for use by AvE
One water cooler with drinking fountain.
Installed equip-
1
ach
Tadtewet
Indiree
$22,048.57
8, 98.92
$560.10
$31,557.58
he National {
FansMaaben +
.
Prorati to Unite
f
Charges