or: ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 43 6 (3. $0} COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS ANO DATES: JO8 NO. 640 23-133 12/ 9/50 2B-135 12/ 9/50 28-322 12/12/50 CONTRACT NO, For: AT-( 29~1 1-507 Pai SHEET WO. UL OF 64 s P “Not for use bg A-E ye 33 LOCATION PARRY ISLAND - SITE "B* DATE OF THIS REPORT: 12 December 1951 The Complete Construction of Open Air Motion Picture Theatre Building No,; 200 ESTIMATE "Property DESCRIPTION OF PROPERTY UNITS Account Quantity Unit Number Construction Contract Cost Est'd. Value Gov. Furnished Material Engl neering Coat Total OPDI AIR MOTION PICTURE THEATRE Thies facility consista mainly of a Shelter Structure, wood frame, anchored to reinforced concrete piers, roofed with corrugated alumimua, sides and ends open except for wood sheathed wal] sections at the four corners and roll-up canvas curtains closing the remaining sections of the rear wall. Platform flooring is elevated by four step-up sections toward the rear. The sise of the structure under roof is 36'-6" x 6i,'-6", a total of 3,064 square feet. The Projection Room, on top of the shelter structure, is wood frame covered with corrugated aluminum, both roof and sides. Stairs and a walkway with handrails lead up to the projection room from the rear of the shelter structure. The size of the Projection Room is 8'-O" x 11'-6", a total of 92 square feet. The Screen Structure, located 60'-6" from the Projection Room, is of wood frame construction 16'-0" wide and 19'-6" high, mounted on and braced from reinforced concrete anchor piers. A Boxing Arena, sise 2h'-0" x 24'-O" and elevated 3'-0" sbove ground, is located directly in front of and at the base of the screen structure. The Arena is constructed of heavy timber, and the flooring of 2° x 46" planks totale 576 equare feet. Electrical wiring, fixtures and equipment include two projectors, two speakers, and flood lights. Seating facilities consist of 40 folding chairs andi 1,06 lineal feet of benches with back reste for a total seating capacity of 655 men. Direct Indirect WcLUriN TO DOE/NV TECHNIVALtWrCHiMa [pg RESOURCE CENTER $12,016.95 5,976.98 $271 89 $18,265.22 *Proration of Charges to Units