ATOMIC ENERGY COMMISSION

SANTA FE OPERATIONS OFFICE

-'

SHEET NO __ 26 or_2}

COMPLETION REPORT FOR

AS-AUILT DRAWING NUMBERS AND DATES:

JOB NO. G40 » Bf

CONTRACT NO.
For:

“Not for use by AcE

AT-(29-1)-507

LOCATION ENGQEBI ISLAMD - SITR Ef

DATE OF THI @ REPORT:

The Complete Construction of Sedieutifie Stations not covered by

gui laing No.:
detailed Ae-bullt drawings.
7 "°°" tations Noe bof, 164, 132ef, 13204, 160¢ thra 1664, and 415

3

9T daly 1951

ESTIMATE

“Property
Account
Number

| re -

we

DESCRIPTION OF PROPERTY UNITS

a

Quantity

Unit

——

Construction
Contract
Cost

—

tst'd. Value
Gov. Furnished
Material}

Cnai
.
noe 9

Total

*p
Charges to Unite
*

STATIONS
30'* wood reflector poles instalied as requested by Users

7

Each

Direst

Indirect

$ 627.08
257280

$ 3.18

§ 888.06

RADAR BEACON, STATION 6)54

|

240 Volt aC power installed for this atation. Eqipment installed by Users

1

£

ae

Each