ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

aFO.436
(3. 80}

COMPLETION REPORT FOR

Peeene

AS-BUILT DRAWING NUMBERS AND DATES:

$=-100
30-608
30-623

38-6612.)
38-6613

“Property

L/2/S1
b/2/51
/2/Si
b/2/52
i/2/s

JOB NO. 619 = bh

CONTRACT WO.
For:

SHEET WO.

23

DATE OF THIS REPORT:

2 April 1951

300! Steel Tower
ESTIMATE

Quantity

Construction
Unit

Contract
Cost

Est'd.

Value

Gov. Furnished
Material

Engineering

Total

Cost

A steel tower, 27' heel to heel at foundation, 40' section at 12'-6" elevatian,
tapering to 20'-O" leg spacing, triangilar section, with ladders and crossover
platforms every 25', rising to 301'-6* elevation, erected on reinforced concrete
foundation and bese alah with piers and footings spaced 27'-O° undar the three
legs and connected with tie beams, lift pit incladed ani 3° asphalt concrete

paving to a 00' radius, at the 301'-6" level a steel framework sise 16'-0" x

22'.08
amchorege for the steel] frame tower heuse, size 16'-)" x 18'-0"
x 13'-O* high, corrugated alusinum covered rocf and side, plastic glasing, grating
floor with 7' x 7' opening, batches in roof for hoist block and acosss, roof is

provided with a catwalk, the tower structure contimues to a height of 322'-&"

where the main hoist beam is supported by "A" frame construction, on top of the
strocture are lightning rode with grounding cable, and aircraft warning lights;

(1 1/2" diameter) are attached and extend

353" to concrete anchorage below, (31 ou. yds. concrete each); two
cables 635' each are provided end anchored in concrete blocks, 3' x l' x

r
6‘, for

wapporting the coaxial cable and a hand winch and cable (650') for their inatallation, the elevator and main hoist mechines (2) are mounted on concreted foundations
and a motor generator is housed in a wood frame, corrugated alumimm covered

sides and roof, sise 12'-0" x 12'-0" x 9'-3" mean height, on
with
transformer bank on a concrete slab, sine 3' x
area 17' x 13' is enclosed by a wire fence, the tower house,
ie complete with electric wiring and fixtures, elevator cab,
telephone installation.

23

*Not for use by A-E

EMQRBI ISLAND ~ SITE *E*

STxE.

at the 250' level three persment

OF

No.:

DESCRIPTION OF PROPERTY UNITS

Account
Number

LOCATION

al—{ 29-1 )-507

The Compiste Construction of
Bullding

SreTteST—

a concrete slab,
7', the surrounding
structure and area
nein hoist, and
Tewer Structure

$172,407.83

Asphalt Paving Circle

83, 102 18

10,964.00
,
35, 799ole

$1,390.1h

$278,761.97

$1, 704.90

$120, 606.51,

“TT ie di
the BN atx
see
ma ms
prof Wo
trad

feat ut

"Proration of
Charges to Units