ATOMIC ENERGY COMMISSION
gets FE OPERATIONS OFFICE
SFO-43 «
(3-90)
AS-BUILT DRAWING NUMBERS AND DATES:
17k&-238
JOB NO.
640
6/7/91
CONTRACT NO,
For:
AT-( 29-1 1-507
LOCATION
The Complete Construction of
SHEET wo.
Saar
COMPLETION REPORT FOR
22
or 23
“Not for use by A-E
EMQEBI ISLAND - SITE “E*
DATE OF THIS front:
Jetty and Channel
7
June 19
a
Bullding No.:
ESTIMATE
“Property
ESCRIPTION
pesca
Nomoer
on
OF PROPERTY UNIT
7
.
Quantit
“
”
Unit
"
Construction
Contract
“Cost.
Est'd.
Value
Gov. Furnished
Material
Enal
.
gineering
Cost
*Prorati
Total
roration of
Charges to Units
Zan
The jetty sear the south tip of the island extends 350 feet out into the ocean,
sise approximately 1,500 square yards. Required an estimated 5,000 cubic yards
ef corel rock fill. At the off shore end of the jetty eufficiem area is
provided for the construction of Stations 721, N.B.S. User Stations #5/ & U, and
PA & Q.
1
Jetty
Direct
Indirect
$163,744.87
133,001.27
$179 beh
$296,925.56
$5L.99
$45,296.77
CHANNEL
A marine ochanne) adjacent to the jetty and extending approximately 2,000 feet to
ebore of Muein Island with remps at each shore provides a direct and safe route
for water craft between the tw islanis,
1
Channel
Direct
Indirect|
$30,039.26
18,203.12
TH ie dacume
es
the one 1
ae eh t
Calo tes por oe
{iach
predatedsis fiey ro