COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS ANO DATES:
98-509
FS-271

7E508

ATOMIC ENERGY COMMISSION
z SANTA FE OPERATIONS OFFICE

2/5/51
(3/23,
ie
51

AG

PS=173-3
ee

JOB NO.
a
51

CONTRACT NO,

640 - Le

_AT={ 29~1 1-507

Papstiaine No.:

og _23

*Not for use by A-E

LOCATION EBNGEBRI ISLAND - SITE "g*

DATE OF THIS REPORT:

23 March 1951

640 <1 *. For: The
¢Complete Construction of Fresh & SaltWater Systens,scaltFat
t Fater
|Well &
Suction
Water Towers, Acid Tank Bldg., and Temporary Di
Plant

-

2/13/51

640 = 64,

sHeet wO.__28

Sdete.

:
,

92, 105, 120, and 202

ESTIMATE
“Property
Account

Quantity

DESCRIPTION OF PROPERTY UNITS

Unit

Construction
Contract

Est'd. Value
GOVE aeerrapned

En

gineerin
9
Cost

Total

SALT WaTER SYSTEM

Salt Water Piping System - Outdoor - Pipe, 4" Transite; pressure 150#; underground 2'-6" minisum; 1,410 lin. ft. Pipe, 3" Transite; pressure 150#; underground 2'-6" minimum; 200 lin. ft. Services, water ~ copper pipe; 6 each: 1 1/h",
k2' average length, 3 each, and 1", 202' average length, 3 each.

SALT WATER WELL AND SUCTION PIPING = Adjacent to the power and water distillation

it, a
.
eep
cover is provided with piping, foot valve,
and fittings which lead to the pumps in the power plant. The well 0.D. 5'.0" x
5'-0" x 16'-]" 42 of reinforced concrete with seepage slots in the lower section.

2

Systen
Direct

Indirest

$6,153.06

4, 358.07

$254.56

$10, 765.69

FRESH WaTER SYSTEM

Fresh Water Piping System - Outdoor - Pipe, 4" Transite, preseure 150, under2'-6" minimm, 1,110 lin. ft.; Pipe, 3" Transite, pressure 150%, uander—
2' a6"

minimus,

380

lin.

It.

Pipe,

i"

Steel,

SO lin. ft.) Services, water-—- copper pipe, 12 eacht

SO

lin.

fto3

PY

_

2°

Steel,

4 each - 11/4", average

55 feet; 3 each - 1", average 110 feet; 5 each - 3/1", average 52 foete

TEMPORARY DISTILLATION PLANT -

«

Systen

1

Each

Direct

$7,223.17

$202

Thies is a one story, wood frame, shed roof, corrugated aluminum covered, canvas
siding, erected on a 5" thick concrete slab, size 20'-0" x 0'-0", floor area
800 square feet, complete with electric wiring and fixtures, fresh and salt
water piping, fresh water pontoons, fresh water tank, 25'-O" diameter x §'-0*
high, pusp and fuel of] pontoon on platform. Installed equipment includes:
Three distillation units, and one pump.
*

1

+

Cost included in Distillation Equipment

TOTAL - Distillation Equipsent
Located in Bldgs. #100 & 202

Direct
Indirect!

$113,086.62
3h,266.4)

$117,373.06

Contimed on Next Page

verde documen
mah
S

- *T

Fe
T

GL,

the Nations: Per
triapmine py ort
in aby mawner t
prokibited and
penditien uoder

.

Proration
Units
to of
Charges

Select target paragraph3