ATOMIC: EWERGY COMMISSION

SANTA FE OPERATIONS OFFICE

eo

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
Pook

ye

mos33

eh

ress

JOB NO.

640 — 6e

ya

CONTRACT NO.
For:

.

AT-(29-1)-507

LOCATION EMQEBT ISLAND - SITE "E*

The Complete Construction of Shop Buildings and Orwase Pit
Bullding No.:

sueet wo.8 or23
Not for use by A-E

DATE OF THIS REPORT:
3

ary 1951

99, 102, 111, and 198

ESTiMATE
*Property

DESCRIPTION OF PROPERTY UNITS

Account

Quantity

unit

Construct lon

Cost

Est'd.

Value
shed
GovFural

EnglCost
neering

Total

*Proration
Charges to ofUnits

SHOP
Que story, wood frame, gable roof, sides and roof covered with corrugated alusimm

sheets, erected on s 5" concrete alab, sise 16'-0* x 2)'-0", 38) square feet.

Klectrie wiring and fixtures.

The sise I.D. is 15'-k" wide x 23'-k" long x 10'-9*

high with « cubic sonteat of 3,545 cubic feet. Installed equipment includes:
Teble end radial sews, four electric portable saws, and a portable electric drill.

1

Each

Direct

Indirect}

SHOP BO

-

1,102.57

$115.77

06, Zab 03

$63.00

$1,263.00

$26.10

$536.80

2

Five insh thick reiaforced concrete alab 25'-2" x kl'-10 1/2°.
MOTE:

$5,023 .Lh

1

Rach

Direct

Indirect

Foundation poured, but no building erected, no installation sade.

$619.50

598.50

FIT
Reinforced conerete pit; sige I.D. 2'-6* x 14'-8" x k'-0" deep; walls and floor

6° thiek; floor sloped to drain in center of pit; four wood steps at one emi of
pit; reinforeed comerete sleb, 6" thiok on four sides of pit, sleb Lu" wide
at each aide, 3'-0" wide at one end ami 11°-0" at one and; floor area 0.D. 13'-2"
x 33'-8", total kk square feat. Side walle project &" above surrounding slab;
a

i

Zach

Direct
Indirect

$259.60
250.80

f

SHOP
One story, wood frame, shed roof, corrugated alumimm roofing, sides covered with
corrugated metal siding uith screen openings, erected on a S" concrete slab, sise
12'-0" x 12'-0", lk square feet, electric wiring and fixtares. The sise 1.D. is

1i'-4" wide x 11'-k" long x 8'-9" high with « cubic content of 1,123 cubic feet.
Installed equipment includes: Two portable electric drills, grinder, bench vise
end voltaster.

CAU
“This docu
contan
tp Nationa
tens of:
1

Bagh
Direct

Indirest

tipramiseiongh the techs
plotuiteda%d muyeon

/

Penalties under appli

61,065.42

SOT LS
*

65k 43

$2,445.30

Select target paragraph3