ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 420
(3.50)

Splie@oReS-T

COMPLETION REPORT FOR
JOB NO.

AS-BUItT DRAWING NUMBERS ANO OATES:

3V-Ob1

30-68,

6hO - Sh

4/3/51

For:

36-687
4/3/51
36-5138 4/3/51

3G=062

30-063

17-256

30-682

H-683

CONTRACT NO.

“Not for use by A-E
3 April 1951

200 Foot Tower

5 June 1951

Quantity

30-5422,
30-56L1,
3V-5669,
3V-6615.

Construction
Unit

Contract
Cost

Est'd. Value
Gov. Furnished
Material

Engineering
Cost

Totai

30-5423, 30-5430, 30-S4K5, 3V-54L9, 30-5625,
30-5647, 30-5651, 30-5653, 30-565h, 30-5656,
30-5672, 3V-5675, 3V-5676, 36-5677, 3V-5698,

A steel tower
legs horisontally and vertieally eross braced, size 0.D, 20'-08
x 20'-0" x 200'-O* high, erected on 4 reinforced concrete footings, and steel

piling. Kight guy wires from each of 2 levels 75' and 175', to 8 reinforced
conerete guy anchors and messenger cable anchor; tower topped with steel checkered
plate deck upon which is mounted a corrugated sluminum cab with sheet alusiqus

roofing, cab sise 0.D. 20'-0" x 20'-0* x 23'-5" high. A hoist beam extends
above cab. A skip bolet is installed on cutside of tower, the main hoist is
installed inside of tower. Hoiating machinery ia installed on reinforced
concrete bases near base of tower. A steel ladder with guard is attached to
<A water piping system complete with tanks, pumps and piping extends

from base to top of tower. A ventilation fan is installed on roof of cab. A
generator house is a one story, shed roof, wood and corrugated aluminum building,

size O.D. 12'-0" x 12'-0" x 9'~3" mean height, erected on a i" concrete slab

with motor generator and base installed, floor area 11); square feet. A concrete
elab 6" thick x 3'-O" wide x 20'-O" long and a surrounding area 12'-O0* x 26'-08
ie enclosed by a $'-6" high wood fence. Complete with electric wiring and
fixtures including signal lights, obstruction lights, grounding, lightning rods,
telephone and signal cables, and messenger cable. Installed equipment includes:
Qne winch.
PAVING

-

Dwg, 17¥-256

The asphaltic concrete

19

LOCATION & EBERIRU GROUP = SITES "D-V" DATE OF THIS REPORT:

200 FOOT TOMER

tower.

OF

ESTIMATE

30-5139, 30-510, 30-514,
30-5630,
39-5666, 3¥-5667, 39-5668,
3V-46601, 3V¥~6609, 3¥-6610,
W-5626, 36-5627,

AF

Building No.:

DESCRIPTION OF PROPERTY UNITS

Account
Number

AOMON, BIIJIRI, ROJOa,

AF-( 29-| 1-507

The Complete Construction of

6/5/51

"Property

SHEET WO.

6/5/51
around the tower extends to a 1000' radius.

center area to a 1,00' radius is 3" thick, the balances is 1 1/2" thiek.

The

TOTAL = Tower Strusture

TOTAL - Asphalt Paving

Direct
Indirect

$21,7,517.05
200,558.53

$1,262.96

$Lh9,358.5h,

Direct
Indirect

$99,934.87
67,086.41

$1,512.2h

$165 ,533.52

*Proration of

Charges to Units