ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Sra. 436
(8. 00)

COMPLETION REPORT FOR

JOB NO. 640 -Sa & g

AS-BUILT DRAWING NUMBERS AND DATES:

1-22

3

6

Mb/s

CONTRACT NO.
For;

Sete

sweet wo._2h or39
"Wot for use by A-E

AOMON, BIIJIRI, BOJOA,

AT=( 29-1 1-507

LOCATION & EBERIRU GROUP - SITES “D-¥" DATE ee REPORT:

6april‘s.

The Complete Construction of Roads & Buildings ~ Caap Area

=~

.

Bullding No.:

ESTIMATE
“Property

DESCRIPTION OF PROPERTY UNITS

*ecount

Quantity

unit .

Construction
Contract
Cost

Eat'd. Value
Gov. Furnished
Materlal

Engl
ngl neering
Cost

Total

0738.50

$51,326.55

ROADS AMD BUILDINGS - CAMP AREA
The comp area, approximately 500 feet x 1000 feet, includes ecientifia station

#69, power house and other facilities for the cmp including an open air movie.

Temporary es well as permanent water distillation facilities, tents, sheis, md
tanks. The roads approximate 1500 linsal feet and the original tent area was
inereseed from 530 to 79 ~- four nan tents.

salt water overflow.

A pit is provided to take oare of the

Site Preparation

1
135,120

Site
aq. yds.

Direct

Indirect

$33,651.53
16, 736-52

@

°p

roration of
Charges to Units