20-367-3

SATs

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:

20-907-3
20-7083
20~452=3

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

.

$F0.43 0
(3.0)

2/2/d
2/2/22
2/2/S1
2/2/51

20+9592
20-453~3

FS-U2h

2/2/52
2/2/51
2/2/51

¥FS-197-2

2/10/51

¥S-169-2

JOB NO.

640 - Se

2/2/51

“Property

-

CONTRACT NO,

For:

DATE OF THIS REPORT:

100 Man Mess Hall, Boiler House, and Garbage

10 February 1952

Joh and 118°°°786" Shed

ESTIMATE

Quantity

Unit

Construction
Contract
Cost

Est'd. Value
Gov. Furnished
Material

Engineering
Cost

Total

200 MAN MESS HALI, - Bldg. #10),
Qne story, double roof, prefabricated aluminum atructures rectangular shape; sise

I.D. 2h'-O" x 100'-6 1/2" x 10'~0" mean height; with attached wood frame, plywood,
screen and corrugated metal refrigerator building; set on a 5" thick concrete slab,

1,962 square feet; vented window panels; eleotrinal wiring and fixtures, and
telephone installation; plumbing, including fuel o11 and steam piping; floor area

O-D. 3,456 square feet; cubic content I.D. 30,405 cubic feet.

Special features:

Floor provided with eight drains conveniently located and 6" high curb under
steamer in scullery; four exterior concrete pads each 3'-6" x 5'-0" for enclosed
soreened entryways; screens on all doors and window,

,

Installed equipment includes: Steam and hot water generating units, two ice
machines, four walk-in and one reach-in refrigeratore, one freeper, one ice crea
cabinet, cold pan, rmmge, oven, stems cooker, dish washer, three hoods, three

exhauster fana, grease arrester, two deep fat fryers, ons stem kettle, griddle.
and stand, coffee urn and stand, food chopper, potato peeler, slicing machine,
food mixer, knife sharpner, food cutter, meat block, steam table, counter,
water cooler with drinking fountain, three sprayers, and seven wrk tables.

Direct

$63,628.92
21,731.53

$829.61

$86,190.06

$4,358.91
83h.90

$37.26

$5,231.07

BOILER HOUSE
A one story, wood frame, aluminum covered structure, anchor bolted to a 5" thick

concsrete alab with floor drain, sise 13'-0" x 11'-0"; fuel-oil storage tank
5'-O" diameter by 6'-6" long saddled l'~O" above ground on concrete piers;
located edacent to Mess Hall.
.

Direct
Indirec

GARBAGE STORAGE SHED - Bldg. #118
& one story wood frame, shed roof corrugated aluminum covered, plywood and
screen ei
» erected on a concrete floor slab sise 8'-0" x &'~0" (6) square feet)
with « 6" x 6" concrete curt, complete with plumbing, salt water and stem
piping. Inside dimenaious 7'-4" xz 7'-4" x 7'-9" high with a cubic content of

537 eubic feet.

This shed includes a wood ramp leading up to an elevation of 6'-10" from one of

the screen doors.

The ramp, including the hand railing, is 9'-4" high x |,'-0"

wide and 25'-10" long.

19

"Not for use by A-E

LOCATION & EBERIRU GROUP ~ SITES "D-¥"

The Complete Construction of

DESCRIPTION OF PROPERTY UNITS

Account
Number

AOMOW , BIIJIRI, ROJOA,

ToL 29-1 1-507

Buliding No.:

sveeT wo.6 or_

>:

Each
Direct
Indirect

$18.87
266.57

*Proration of
Charges to Units

Select target paragraph3