sr0.430 ATOMIC ENERGY COMMISSION | (3. 50) SANTA FE OPERATIONS OFFICE COMPLETION REPORT FOR AS-Bull.T DRAWING NUMBERS AND OATES: . Tth Engineering Brigade Location Sheets #1 thra #18, dated 1) Janary i JOB NO. 640 = 2a 6140 ~ 2b ain - 2c . S SHEET NO. For: __ OF i. "Not for use by A-E DATE OF THIS REPORT: a Janury 1951 CONTRACT NO. AT-( 29-1 )-507 LOCATION EMIWETOK ISLAND - SITE #a* . The Complete Construction of Site Preparation, Roads and Airstrip 640 - 26 Li Bullding Now: — ESTIMATE ep Ppone t Account m a POY co struction Quantity unit Cost DESCRIPTION OF PROPERTY UNITS Est'd. Value | waterialn , . eet . Fotal pe 4 -- oo . Charges toUnits vee — Rummy is 150' wide x 7,050' long and includes 2 1/2" asphalt paving of 150' x demeaie « “t Asphalt Paving Ruoways & Warn Up sree fy 63,055 Sq. Yde. Direct Indirect Plane Parking Area-—clear, level, and stabilise 125,066 $37,592064 22,525.96 $836.63 $60,957.23 Sy. Tde. Direct Indirect ad “Eee -., 3,050' and a concrete ware up alab 100' x 100' x 8" thick. Adjaceut areas for Plane parking and taxiways included olearing, leveling and stabilising. Wers wp area includes 3° asphalt paving of approximately 12,000 square yards, \Geed Te oS AIRSTRIP ¢4 kan. $15,337.7h 7,966.61 - 23,304.35 ey ROADS Include 2 1/2° asphalt paving of principal 24‘ roadways to the extent of epproximately 9,000 lineal feet (24,000 square yards). Asphalt Paving fag] 21,000 Sq. Yds. Indi rect Blade & Shape 0,000 7, 286.39 Sq. Yds. Direct Indirect $2,122.87 188,53 SITE PREPARATICN Cleared, leveled and stabilised area of approximately 6,000 square yards. Blade & Shape 46,000 173.295 Sq. Yds. Direct $13.54 787.50 46,960.40

Select target paragraph3