sr0.430
ATOMIC ENERGY COMMISSION
|
(3. 50)
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS-Bull.T DRAWING NUMBERS AND OATES:
.
Tth Engineering Brigade Location
Sheets #1 thra #18, dated 1) Janary i
JOB NO. 640 = 2a
6140 ~ 2b
ain - 2c
.
S
SHEET NO.
For:
__
OF
i.
"Not for use by A-E
DATE OF THIS REPORT:
a Janury 1951
CONTRACT NO.
AT-( 29-1 )-507
LOCATION EMIWETOK ISLAND - SITE #a*
.
The Complete Construction of Site Preparation, Roads and Airstrip
640 - 26
Li
Bullding Now: —
ESTIMATE
ep Ppone t
Account
m
a
POY co struction
Quantity
unit
Cost
DESCRIPTION OF PROPERTY UNITS
Est'd.
Value
| waterialn
,
.
eet
.
Fotal
pe 4
--
oo
.
Charges toUnits
vee
—
Rummy is 150' wide x 7,050' long and includes 2 1/2" asphalt paving of 150' x
demeaie
«
“t
Asphalt Paving Ruoways & Warn Up sree
fy
63,055
Sq. Yde.
Direct
Indirect
Plane Parking Area-—clear, level, and stabilise
125,066
$37,592064
22,525.96
$836.63
$60,957.23
Sy. Tde.
Direct
Indirect
ad
“Eee
-.,
3,050' and a concrete ware up alab 100' x 100' x 8" thick. Adjaceut areas for
Plane parking and taxiways included olearing, leveling and stabilising. Wers
wp area includes 3° asphalt paving of approximately 12,000 square yards,
\Geed
Te
oS
AIRSTRIP
¢4
kan.
$15,337.7h
7,966.61
-
23,304.35
ey
ROADS
Include 2 1/2° asphalt paving of principal 24‘ roadways to the extent of
epproximately 9,000 lineal feet (24,000 square yards).
Asphalt Paving
fag]
21,000
Sq. Yds.
Indi rect
Blade & Shape
0,000
7, 286.39
Sq. Yds.
Direct
Indirect
$2,122.87
188,53
SITE PREPARATICN
Cleared, leveled and stabilised area of approximately 6,000 square yards.
Blade & Shape
46,000
173.295
Sq. Yds.
Direct
$13.54
787.50
46,960.40