COMPLETION REPORT FOR
FS-627
Fs-394
CONTRACT NO.
610 -~ 2r,
DRAWING NUMBERS AND DATES:
51D - 2s
4/23/51
4/19/51
For:
AT~( 29-1)-507
LOCATION
ENIWETOK ISLAND - SITE "A*
sHeET Mo 37 _ or, bh
“Not
23 April 1951
The Complete Construction of Cargo0 Pier and Personnel Pier Landing
Building No.:
for use by A-E
DATE OF THiS REPQRT:
-
¢
140 and 142
ESTIMATE
=
oy
Property
Account
DESCRIPTION OF PROPERTY UNITS
umber
Quantity
yo
.
Unit
Const ruc tion
Contract
Value
agen isned
Engineerin
3
4
:
Total
7
*"Proration
Jt.
of
Charges toUnits
CARGO PIER - Unit #140
A conventional type wood structure of heavy timber, piling, dolphins, end decking.
The main deck is approximately 59 feet wide x 6 feet long, with an approach
20 feet wide x 35'-3" long, surrounded by an exiating mole. The decking totals
4,481 equere feet and is elevated 10 feet abowe sea level.
1
Keach
Direct
Indirect
$20,198.77
553.37
$226.21,
$20,978.38
Direct
$27,360.79
Indirect 17,848.23
$226.25
$45,435.27
PERSONNEL PIER LANDING - Unit #242
This wood structure built around existing piling consista of two stairways and
deck, blocked, braced and bolted complete with fender piling and handraile sise
spproximately 16' wide x L0' long x 13' high.