ATOMIC ENERGY COMMISSION
‘Wer spe: FE OPERATIONS OFFICE
Sro- aie
COMPLETION REPORT FOR
.
oan
CONTRACT NO.
JOB NO. 640 = 25
AS-BUILT DRAWING NUMBERS AND DATES:
For:
Vanier
.
SHEET MO
“Not
Quantity
DESCRIPTION OF PROPERTY UNITS
Number
for use by A-E
11 Jamary 1951
;
ESTIMATE
ya
Account
[Construction Est'd. Value
unit
—
Contract
Cost
Gov. Furnished]
Material
rr
EN9ineering
Cost
|
rs
Total
oO
AIR TASK GROUP HEADQUARTERS
One story, double roof, prefabricated aluminum construction; "5" shaped; sise 1.D.
2h'~O" x 104'-8 1/2" x 10'-0" mean height; with 3 wings, each 24'-0" x 50'-8 1/2"
x 10'-0" mean height; anchor bolted to s 5" thick concrete slab; vented window
panels; standard aluminuz partitions; electrical wiring and fixturea; plumbing;
floor area 0.D. 6,507 square feet; cubic contents I.D. 61,640 cubic feet.
equipment includes:
Two water coolers with drinking fountains.
Installed
OF_ _W
90
Building No.:
|*property
23
DATE OF THIS RERORT.
LOCATION ENIWETOK - SITE "A"
_AT~( 29-1 1-507
The Complete Construction of Air Task Group Headquarters Building
20-032 1/11/52
a
.
Be...
1
Each
Direct
Indirect
$54,539.92
2,130.72
>.
$1,320.77)
$58,491.38
"Proration ot
Charges to Unite