*"
SFe.43 0
(3.50;
A%S-KBUELT
24-9399
24-940
24-389
2h—482
2a-976
ATOMIC ENERGY COMMISSION
“SANTA FE OPERATIONS OFFICE
5 eT
COMPLETION REPORT FOR
DRAWING NUMBERS AND DATES:
1/4/51
JOB NO. 640 = 24-]
1/4/51
CONTRACT NO,
For:
via
AT~(29-1 1-507
_
The Complete Construction of
Building No.:
LOCATION EMIWETOK ISLAND - SITE "a*
oe
|
use
by
4 Jannary 191
Quantity
.
Unit
;
ESTIMATE
‘Construction
Contract
Cost
Est'd.
Value|
Gov, Furnished]
Material
——
Engineering
Cost
a.
Total
i
" comurssany
|
|
|
|
!
|
|
|
One story double roof prefabricated construction; rectangular shape; sise ID,
24'-0" x 178'-8-1/2" x 10'-0" mean heights anahor bolted to a 5° thick reinforced
concrete elab, elevated 4'-0" above grade; earth fil); vented window panels;
aluminum pertitions for toilet and portion of cffice; portion of office set off
with single panel plywood 4'-O0" high partitione; electrical wiring and fixtures;
plumbing; reinforced concrets loading platform, slevated 6'-0" x 72'-0* x 5®
thick, total 432 square feet; concrete steps, 3'-0" wide, at each end of platfors,
Compacted [11] under building floor, loading platform and steps, Floor area 0,D,
4,527 square feet; cubic content 42,890 cubic feet,
A-F
37
|
| DESCRIPTION OF PROPERTY UNITS
for
DATE OF THIS REPORT:
Commissary Building
1/4/51
“Property
Account
Nuaber
smeet NO. 16 _ or. Yh
“Not
1
Each
Direct
Indirecti
$11,182.75
8, 588,96
ge
$706.53
$20,478,246
*Proration of
Charges to Unite