ATOMIC ENERGY
She ata
13
#
Seis
SANTA
FE
COMMISSION
OPERATIONS
OFFICE
COMPLETION REPORT FOR
1
at
na
hieNO.
640 = 35
CONTRACT NO. |AT=129-11-507
For:
eee
LOCATION
SHEET NO _
ENIWETOK ATOLL
*Hot
tor
DATE
(tt
Ler
eo
'
LRT EON GE PROPERTY UNITS
ce
A-E
No.:
3
af
ty
THIS FEPORT:
The Comptete construction of DRILLING PROGRAM
Building
A
10% of
ube
Cuantity
ce
Ueit
Contract
+
,
pee
fetta.
+.
bOV~,
Value
Furnis
Material
hed
a ef
Lagineering
( ost
ee a
|.
DRILLING PROURAM
This program was conducted in suport of a geophysical exploration of the
Eniwetck Atoll for the purpose of determining the configuration of the umerlying rock formation, and to determine wave velocities in the various media
encountered, as required by:
a.
MILITARY
b. SCIENTIFIC
Direct
|
$37 240.82
Indirect
28,232,42
Direct
39,343.81
Indirect
34,712,02
eo.
$65 473.24
74, 055 ..B3
ce ee
prebios
gmetimtrem
ore taeda!
"Proration of
Charges
to Unite