COMPLETION REPORT FOR
AG-HILL P ORAWING NUMBERS ANG DATES:
2506
.
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
* |
reat
ua
Mee5
ae
30-088
17@-817
JOB NO.
Ye
a
Account
CONTRACT NO,
For:
The Complete
_
_..
a
Construction of
!O2 ofr.
“Not for use by A-E
LOCATION EMIWETOK ATOLL
DATE OF THIS REPORT:
9 March 1951
Wing Models
.
Station Woe $2)
.
DESCRIPTION OF PROPERTY UNITS
Number
_AT-(29-1)-507_
Building No.:
H25heh 3/9/54
“Property |
82 - 10
sneet no,
'
_
Quantity
Unit
L
Each
ESTIMATE
a
_
Construction
Cont ract
Cost
Est'd,
Value
Gov. Furnished]
Material
.
,
Engineering
Cost
Tota.
|
AMC REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
WING MODELS, STATION $62, SITE “P*
Aocurately located reinforced concrete foundations as follows:
| and B, ona each 1,'-0" wide x 10'-0" x 1'-O" thick with two 1),'-0" long steel
Bolted horigontally to each.
Concrete Total - 10.4 cue yds.
Ba and Bc one each 10'-O" x 16'-0" x 2'-6* thick with two 16'~0" lonug steel columns
balted horisontally to each.
Concrete Total - 27.6 ou. yds.
;
B, one 7'-O0" x 14'-0" x 2'-0" thick with threaded J bolts protruding, two deadmen,
concrete, with 3/L" diameter protruding J bolts, sise each 3'-O" x 3'-8" x 3'-0",
On@ on each side and steal junction box with undergroum conduit.
Concrete Total ~ 9.3 cu. yde.
B,
ona 6'=0" x 9'-OF x 1'=0" thick with two 9'-0" long steel columna bolted
birdsontally and steel junction box with underground conduit.
Concrete Total - 2 cue yds.
Direct
Indirect
$13,072.89
8,823.28
$197.39
$22,093.%
*
.
Eroration of
harges to Units