ATOMIC ENERGY COMM!SS!0N
SANTA FE OPERATIONS OFFICE
SFQ.43a
(3. 50}
AS-BUILT DRAWING Winn AND DATES:
2/51
°
30-078
3-54.26
36-5628, 3
—
eT
COMPLETION REPORT FOR
S08 NO. 729 ~ 26
CONTRACT NO.
4/2/51
For:
4/2/52
4/2/51
:
pn aha nn aen
LOCATION
ENIWETOK ATOLL
DATE OF
DESCRIPTION OF PROPERTY UNITS
+
Quantity
7
THIS REPORT:
2 April 1951
Work ant Storage Tent, Photo Trailer
Buiiding No.: Station Nos, 132a thru g
—
Account
"Not for use by A-F
AT-i 29-1 )-507_
The Complete Construction of Resording Station, Power Supply, T,L, Termination
®
“Property
SHEET No,83 op _
totiMatre
cee ep
ane ee
Unit
Construction
Contract
Cost
4-——
—
fst 'd. Value
Gow. Furnished
Material
Engineering
Cost
Total
4
UGRL AND NALE REQUIRED COMSTROCTION AND LOCATION OF THE FOLLOWING STATICHS:
RECORDING STATION 1320 AND b OM SITE "D - ¥*
& reinforced concrete structure, sise 0.D, 30'-2* x 361-8" x 16'-O0*high, with 36°
thiek fleor and roof reinforced with reinforcing and styvctural steel, exterior
walle 2'-4" thiok reinforsed concrete, interior dividing wall 1'-6" thick reinforced
concrete, 4 reinforced concrete retaining wall 12° thick x 301-2" long sete on
face wall, arth fill at rear of structure and over top to depth of 5'-0", Bach
oonpartuen% complete #ith two axplosion proof doors, slesves
walle, ineetts
for bolts, electrical wiring and fixtures and air conditioning, Installed equipment
ineludes two air conditioning units,
Rach
POWER SUPPLY STATION L3te OM SITE "D ~ ¥*
Two sloping reinforced conctete wing walls attached
1'~2" thiek z 14'-0" long x 12'-4" pean height, set
4" conorste fleor slab, with temporary wood shelter
fill, Complete with electrical wiring and fixtures
to Stations No, 132a anit 132b,
on eoncrete foundations, and
to be removed before final earth
and drains,
Each
T,L, TERMINATION STATION 1324 ON SITE "D ~ Vv"
Temporary wood shelter sise 0.D, 12'-0" x 36#-4 3/8" x 10!-4", plywood roof
covered sith mopped on lif roofing felt, earth floor, Complete with electrical
wiring and fixtures,
Raoh
WORK AND STORAGE TENT STATION 1320 AND f ON SITE "D - ¥*
8 man tent with wood frame on 4" concrete slab,
Eaok
PHOTO TRAILER STATICN HO, 132g ON SITE "D - ¥*
Supplied by user,
Total Cost Station Mo, 132 a, b, 0, a, 9, f and g
the Waticaa We
UPS Nein
ot
Direct
Indireat|
$97, 148,93
53,353,67
ae,
$4,928.69
*Proration of
Charges to Units
$155,431.29