ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 430 13.40} COMPLETION REPORT FOR AS-HUTLT DRAWING NUMHERS AND DATES. JOB NO. F729 = 20 MEONTRACT NO, For: SPELT LOCATION AT-( 29-1)-507 sHeet wo. “Not for use by A-E DATE OF THIS REPORT; ENIWETOK ATOLL The Complete Construction of Limonite Collimator Blocks Building No.: BO or. 10 February 1951 Stationa 10, 11, 12, 14, 15, 19 ESTIMATE ‘roeeets | . Account a a ; _ - DESCRIPTION GF PROPERTY UNITS | , * Quantity + unit Construction . Contract Est'd. Value 7 . eee iened BON Engineering e€ Cost n Total | Reinforced concrete base below grede. Structural steel above grade, anchored to base, and providing means for adjusting and clemping collimator blocks into proper position. Collimetor blocks ere furniehed by others, STATION 10 - TOTAL 1 Keach Direct Indirect STaTiON 11 - TOTAL 1 1 Indirest 1 Indirect i Indirect 1 CaU MON formation affecting United Staten. Ite of ls vontenta huraed perms i in pevere communal le Federal Laws.” 7,HO5.47 4,336.19 213.28 12 454.94 243.80 14,737.85 162.18 9,320.51 156.57 8,591.04 149204 6,466.50 9,121.37 5,372.68 5,976.9 3,181.37 Each Direct S¥aTiow 19 - TOTAL «14,976.50 Eech Direct STATION 15 - TOTAL 6247.65 Rach Direct STATION 14 - TOTAL 5 485.22 Each Direct Indirect STATION 12 - TOTAL #9 243.63 5 684.46 2,750,021 Bach Direct Indirect 5 484.02 2,833.44 ‘Ad. AE wee s *p, ti ; oration to Units Charges

Select target paragraph3