ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE srt. 47a 13.50) Sqn ayaa Gee AWE ONUIMEE BN 3T-Gi .6 - vey 1 5B-038 - for: 3/5/51 LOCATION CONTRACT NO, AT=4 29-14 1-507_ KJ hu, F8G = 22 . ; The 'tomplete Construction of Butlding No.: . Property Aveo ynt Db‘, + REPTION OF —- rr: ee Not for use by A-E Maro Thermal Expo gure Building ‘ Stations 77, 78, 79 is 7 . . Quantity PROPERTY Units sneer wo 74. or mS OF yeiga MIWETOK aTOLL . ee a eH ~ . nit - - ESTItMATE ~— 7 7 Construction fonts t —t.. Cs a “TT a — Est'd. Value rn Cows eo tshed . naa . . Engineerin ae a Total e |. — ——+ So —-—4 a T.B.- REQUIRED CONSTRUCTION AM) LOCATION OF THE FOLLOWING STATIONS: THERMAL EXPOSURE BUILDING, STATION 77, SITE “T* Wood structure on concrete slab. 0.D. 6'-2 1/2" x 22'-0 1/2" x 7'-3 1/8". O.D. slab area 138 square feet, I.D. volume 396 cubic feet. Plywood sheathing inside finish; blanket ingulation between stude and joists, sides md osiling. 2" x 8" redwood sheathing all sides, with outside aluminum covering top and sides, Floor 2'+3" below grade, slope to entrance, oomplete with electric wiring and fixtures. THERMAL EXPOSURE BUILDING, STATION 76, SITE "1" 1 each Direet Indirect; . $16,270.07 $12,172.57 $115.51 $29,166.15 Wood structure on conorete sleb. 0.D. 6-2 1/2" x 22'-0 1/2" x 7'-3 1/8". O.D. alab area 138 aquare feet. i.D. volume 396 aublo feet. Plywood sheathing ingide finish; blanket insulation between studs od joiats, sides ani osiling. 2" x 6" redwood sheathing all sides, with outeide aluminum covering top and sides. Placed on a raft oonsi sting of pontoons and of] drume strapped te a 2" x 8" timber deck, sise 10'-O" wide x 21'-5 1/1" long. 1 THERMAL EXPOSURE BUILDING, STATION 79, SITE “C* each ‘ Indirect 1h .86 180.19 10,938 .86 2000 40 019.67 138.09 9,158.16 2,315.12 2,334.47 56.95 4,708.54 Direot 323.81 Wood structure on oonurete slab. 0.D. 6'-2 1/2" x 22'-0 1/2" x 7'=3 1/6". O.D. slab area 138 aquare feet, 1.D, wolume 396 oublo feet. Plywod sheathing inside finish; blaket insulation between studs and joiste, sides and ceiling. 2" x 8" redwood sheathing al] sides, with cutside aluminum covering top and sides, Floor 2'-3" below grade, slope to entrance, complete with slectric wiring and fixtures. 1 THERMAI. £XPOSURE BUILDING, STATION 79, SITE *P* Wood etrusture on concrete slab, 0.D, 6'-2 1/2" z 221-0 1/2" x 7'-3 1/8", each Direct Indire ot 0.D, aleb area 138 eq<uare feet. I.D. volume 356 oubio feet, Plywood sheathing inside finish; blanket insulation between studs and joists, sides and ceiling, 2° x 8* redwood aheathing al) sides, with cutside aluminum covering top ami sides. Floor. 2'=3" below grade, slope t entrance, camplete with electric wiring & fixtures, 1 each Direot Indirect / Proration of Charges to Unite ——}—- Li i f Number . . COMPLETION REPORT FOR

Select target paragraph3