ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3. 50)
AS-BUILT
*
DRAWING NUMBERS
JOB NO. Fag - 22
ANT UATES:
38-038 - 54/51
28-441 1, - Rie
eee
COMPLETION REPORT FOR
CONTRACT NO.
For::
SHEET NO.7g OF
"Not for use by A-f&
LOCATION BMIWEIOZ aTOLL
The Complete Construction of
Therueal Exposure Build
Building No.: Stations 75
DATE OF THIS REPORT:
9 Maroh, 1951
ie
ESTIMATE
-
s
Ft ee
Propert
Account.
LESCRIPTION OF PROPERTY UNITS
Number
pi eb
ee
|
.
Quantity
;
Unit
wo ee
-—
Construction
Contract
Cost
Est'd. Value
‘
Gov. Furnished
Material
:
.
Engineering
Total
_
1.5. - REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
THERMAL EXPOSURE BUILDING, STATION 75, SITE "E*
Reinforced concrete struoture, partly below grade, 12" thick walls and roof, 1,"
thick floor, insulated on 3 sides and roof; explosion door; electric service;
six openings om aide.
Sise O.D. 7'-7 5/6" x 22'-10" x 7'-8" high with foundation
3t-5" below grade and ramp to entrance.
1
|
' each
Direct
|
Indirect
a,
3,
oth
44,28
$121;.37
$5,358.36
135,79
9,425.90
THERMAL EXPOSURE BUILDING, STATION 75, SITE "a"
Heinforeed concrete structure, partly below grade, 12" thick walle and roof, 11,"
thiok floor, ingulated on 3 sides and roof; explosion door; electric service;
eix openings on side,
Sise 0.D. 7'-7 5/8" x 22%+10" x 7'-5" high wth foundation
35'=5" below grade and rap to extrance,
1
each
Pireot
Indir sot
pies
015k?
*
.
P
t toUnits
f
Charges
a