ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
$FOQ.43 a
13.50)
AS-BUILT
COMPLETION REPORT FOR
JOB NO. 729 = 19
DRAWING NUMBERS ANL DATES:
699.4
3/9/51
H~5636 ,2
3/9/52
For:
3/9/51
W049
CONTRACT NO,
AT~{ 29-1 1-507
Se?
SHEET wO.
Now:
oF
“Not for uge by A-E
DATE OF THIS REPORT:
LOCATION JITW@ETOK ATOLL
9 Marek 1951
The Complete Canstruction of Wood Building
Building
66
Station Ho, 7
ESTIMATE
“Property
shall
——
LESCRIPTION QF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Estid. Value
Gov. Furai shed
Engineerin
vee
9
Total
Le
NR, L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
WOOD BUILDING, STATION NO, 7 CM SITE """
4 one story, wood frame, flat slope roof and sides alusimm covered, wood floor,
erected on four reinforced concrete columns and tis beams, elevated §'-0" over
water, complete with electric wiring and fixtures and telephone installation,
eise I.D, 9'-1" x 91-2" x 81-0 1/2" high above floor which is 14'-8* x 10'-8*,
1
Each
Direct
$4,878,05
Indirect 4,719 64
$96.20
$9,699.99
3,184.83
78,00
7,022,91
3,840,968
3,159.1
79 62
7,979.93
WOOD BUILDING, STATION BO, 7 ON SITR "R*
4 ons story wod frame, flat slepe reef and sides aimmimwm covered, erected on
a 12° concrete alab, sise 10'-8" x 10'-6" complete with electrio wiring and
fixtores and telephone installation, Sise I,D, 9'-1" x 9'-1" x 61-0 1/2" high,
1
Sach
Direet
Indirest,
3,760,08
WOOD BUILDING, STATION NO, 7 OM SITE *P*
A one story wood frame, flat slopes roof and sides aluninun qovered, erected on
a 12" conerete slab, sise 10'-8* x 10'-8", complete with electrie wiring and fixture
and telephones installation, Sine I.D, 9-1" x GI-1" x 8!~O 1/2° high,
1
Eeeh
Direct
Indirect)
"Prorati
f
Charges to Units