ATOMIC
SFO- 434
(2.50)
SANTA
.
AS-BUTL] GRAWING NUMBERS AND DATES:
B-91-3
JOB NO.
2/10/51
729 = 15
F FE
ENERGY
COMMISSION
0 PERATION
TIONS
FFIC
OFFICE
COMPLETION REPORT FOR
CUNTRACT NG. —AT-( 29-1 1-507
For:
LOCATION
The Compiete Construction of
tet no
Santali
"Not
ENIWETOK aTOLL
for
oo
use by
A-E
DATE OF THIG REPORT:
2 Mey 1951
Balloemp Beds
Building No.: Stations 39a, & and o
BE>TtiMAlE
eroperty |
Account
Number
L
Of SCREPTION OF PROPERTY UNITS
_
PE Seal tion Pte vaine Po
Quantity
unit?”
Contract
Cisyt
Gov. Furnished
Material
Pngineen ng
wr
a
Charaes to unit
Total
:
SOBL REQUIRED CONSTRUCTION aND LOCATION OF THE POLLOWING STATIONS:
|
|
|
BALLOON BED, STATIONS 39a AND b, SITE "5"
wo reinforeed concrete footings, 1'-6" x 1°-6" x 361-0", and anchorage, 0.D,
215-6" x 36'=0", area of 774 square feet,
Coral fill,
2
|
|
Each
Direct
Indireot;
$2,734.53
3,160.07
$111.79
$6,006, 39
596,64
646,93
24,81
1,268 38
BALLOON BED, STATION 390,SITE “c*
Two reinforced concrete footings, 1'-6" x 1'-6" x 36'=-0", and anchorage,
21'=6" x 36'-0", area of 774 square feet,
Coral fil),
0,D,
1
Bach
Direct
Indirect
Laine inemation affecting
ot ite Daltied Butew Tus
“9
ober ere of tie onto ee
SR
ch babe Pca
=