ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Jt
SHEET
COMPLETION REPORT FOR
ne MEIN
yor to,
4/2/53
F2Q — 28
S eer...
SUN ERACT NOL —AT~( 29-11-5077
bos:
Ine Complete
Construction
of
LOCATION
NO
Blor
“Not for use by A-E
ENIWETOZ ATOLL
DATE
OF
THIS REPORT:
2 april 7951
Power and Telephone Post Stations
Buildeng No.:
tS TiMATE
ae
ohh
te T PON UF
—
—
PROPERTY UNITS
Vuantity
Unit
Construction
Coutract
1.cost
a eee
vQU
CONSTRUCTIO)
-
ee ee
ae
ee
0
ee
ows
-
a
jo -4
-
TELEPHONE POST STATICNS ON SITE °C"
Plywood box with hinged door, sise O,D, 17" x 7 1/4" x 33 1/2" high, mounted
on 4" x 4* x 8'-O"8 post,
Complete with telephone installation,
8
Each
18
Each
POWER POST STATIONS ON SITE "C*
Plywood box with hinged door, sise 0.0, 17" x 12" x 36" high, mounted on 4" x 44
x B'-O" post, Complete with electrio wiring, fused switch and convience outleta,
* COSTS DISTRIBUTED TO ALL USERS
_
—4
|
Est'd. Value
Gov. Furnished
Material
Engineering
Cast
"Proration of
Charges to Unite