ATOMIC ENERGY COMMISSION
, SANTA FE OPERATIONS OFFICE
skO. 44 u
(3.605
AOL
EMT TG
JE-5660, 4
[tea NEIMHt He
4/2/51
AM
god no.
. Otto
729 = 27
Pon bw ACT
or:
| *.rope rty
|
*
NG, ATbeet bud
The tomplete
tCunstrue tian
Building Na.:
|
SHEET NO | 3 OOF
COMPLETION REPORT FOR
of
Lut AT [ai
KIRTIGN OF
PROPERTY UNITS
Not
for
b ATE
(tr
use by
A-E
THIS RERGKT:
2 April 1951
Hemisphere Location
Stationa 518, 5171, 519, 5141, 5151 and 516)
homo thay »
ott
Ate uowet
ENIWETOK ATOLL
Vuantity
Laat
Contract
Number
Lest
petta.
Mati,
‘diue
Material
-
.
Engineer cen
Cust
turns whe
.
Proratton
‘harges
af
toa Units
4
OCSO AND ESL REQUIRED CONSTRUCTION ANT) LOCATION ON THE FOLLOWING STATIONS:
HEMISPHERE LOCATION, STATION 518 and 517) OW SITE *S*
Round hole in the ground, size 4'-O" diameter x 4'-0" deep,
by user and installed by Holmes & MNarver,
Equipment furnished
2
Each
Direct
Indirect
i
P
1
5
$2.76
$229.06
1,38
114,52
3,58
297 67
wT
Round hole in the ground, aise 4'-O" diameter x 4'-O" deep,
by user and installed by Holmes & Narver,
Equipment furnished
1
Each
Direct
Indirect
49,34
63,80
HEMISPHERE LOCATION, STATIONS 5141, 5152 and 516) ON SITE "KE"
Round hole in the fround, sise 4'-O" diameter x 4'-0" deep,
by user and installed by Holmes 4 Narver,
Equipment furnished
3
Each
Direct
Indirect
128,25
165 84
peter yet Perea
hee daa es
neath
ae
ower
the
cee begte
Dt
cn Te
hauled
fuera) Leawe ”