trBibice
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 434
(3.50)
AS-BUILT DRAWING NUMBERS AND DATES:
100=252-
3/28/51
100=252-2
100-252=3
3/28/51
3/28/51
100-262-1
3/28/51
100=252-4,
sweet W0..2O
COMPLETION REPORT FOR
Jo8 NO, 730.3 - 9o
For:
TT
The Complete Construction of
.
;
=
or 18
*Not for use by A-E
DATE OF THIS REPORT:
LOCATION MUZIN ISLAND - SITE "S"
28 March 19
air Force Structure Type C-1.)
2.3—3
ESTIMATE
Quantity
DESCRIPTION OF PROPERTY UNITS
Account
AT-1 29-4 1-507
Bullding Now:
3/28/51
“Property
CONTRACT NO,
—
Unit
Construction
Contract
Est'd. Value
*
Gove erp i shed
Engineering
* Proratj
'
Chargesfonto oO units
Cost
Totai
~O-
$371,665 06
BUILDING
A reinforced concrete, brick and steel structure, three section, sise 0,D, 120'-28"
long x 236'-8" wide, ends open, side walls of brick and concrete blocks, meta)
window frames and sash, erected on 1'% 1/2" x 5'-4" depth foundation walls, structural steel roof trusses supported by structural stes] columms on concrete pisrs,
built up roof over 2" plank deck and three skylight monitors, sides metal frames
and sash and ends covered with corrugated metal,
One side wall has structural
eteel wing wel) extensions at each end, sise 40'-6 1/2" long x 38'-6" high, the
total height of the structure above grade is 52'-4", the covered area is 28,798
aquare feet,
1
Rach
Direct
$216,674.17
Each
Costs inoladed in Instrumentation
Indirect
Piers for Displacement Gages (Dwg, 100-262-1),
154,790,89
A reinforeed concrete atructure
with a foundation footing 7'-0" x 9'-6" x 2'-0" thick and « pyramid of a rectang-
uley oross section rising 25'-0" above the footing, total mass 11,4 cubio yards,
Location to be shown on site plan,
Instrumentation
Total Structure and Instrusentation
Miscellancous Materials Furnished to Air Force
6
Direot
Indirect
Direct
Indirect
Direct
Indireat
40,875.21
38,087 ,29
$9,614.61
88,577 11
257, 749,38
192,878,18
9,614.61
460, 242,17
4,373 34
2,617, 63
&
-0-
,
6,990,97
teh
5
:
obs
|
oS
ong
I.