ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SET
COMPLETION R EPORT FOR
lit te.
Tag = Bg
LUCATION EMGEBY ISLAND - SITE Ef
MINTRACT NO. ALOT 29-1hu?
for:
5695.1 ~ 5/16/51
38-5696 ~ 5/16/51
The tomplete Punstruction of
Huilding NO.:
sHeet NO Dh ior
for use by At
DATE
OF
Ganex Colliamator Towrs #1 and #2
Statdona Wo. 1454 and 1464
pee
gy.
“Not
THIS REPORT:
16 May 1951
to FEMALE
ee
-+f += fsanmytey.
ro.
fede TPON JF
PRorRRTY
UNITS
Waa tity
ead
Sorters
rota. .atue
we. tures shed
Material
tron
t
.
GANEX COLLIMATOR TOWER
STATION MO.
Tk
A steel tower, 101-0" x 10'-0% 2 291-8-5/8" hign, with timber deck, ladder, chain
hoist and trolley, erected on « reinforced concrete foundation md faetings 4'-0"
ainimus below grade.
|
-
a
“Pearatian aft
Engireeringy
toot
CNarges
po
|
I
|
|
1
|
Each
Direct
Indirect
$5,593.10
2,742.39
$276
$8,362.95
22027
6,908 ,20
i
GAN KX COLLIMATOR TOWER #2, STATION MO. 1ybt, SITE i
A steel tower, 10'-0* x 10'-0" x 19'~9-3/16" high, with timber deck, ladder, chain
hoist md trolley, erected on a reinforced concrete foundation and footings | '-0"
minimus below grade.
1
Bach
Direct
hp 568.85
Indirest
2,217.08
~
uy
“7 an
prot
penal
to Unit: