ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
$FO.430
(3.50)
AS-BUILT DRAWING NUMBERS AND DATES:
JOB NO.
yon = there
5R-5691 - 5/16/
“Pro
SHEET No.
COMPLETION REPORT FOR
t
Account”
Number
729 -
CONTRACT
For;
NO,
DATE OF THIS REPORT:
18 May 1961 ©
Temex Collimateor
Building No.: Stations &, 94
Quantity
Unit
ESTIMATE
Construction|
Contract
Cast
Est'd.
Value
Gov. Furnished
Material
ee
.
,
Engineering
os
Total
listed are indicated by the following:
oubio yards
qubie yards
1
e#ach
Direct
Indirect
Station 9
1
$6,387.86
3,277.7h
$29.80
$9,695.10
2.45
7,423.88
each
Direct
Indi rect
$4, 993.28
3,010.15
CAU
Thia dorument conta
Bes. «cp
*Proration of
Charges to Units
Po Pe
Reinforeed concrete base below grade, structural steel abow grade, anchored to
base and providing means for adjusting and colemping collimator bleeks into proper
position, Collimtor bloeka furnished by others. The variations in the stations
Station 5
+
Y
TRMRXI COLLIMATOR, STATIONS &/, of, STATION Bf
Sta. Ho. Gf Footings Type II
26'~0" x 10'-0" x &'-0"=
Sta. Mo. Sf Pootings Type KAVI! 22-0" x 10'-O" z '=0%s
or 2)
"Not for use by A-E
LOCATION SMGRBI ISLAMD - SITE Ef
—AT-1 29-1 1-507
The Complete Construction of
GESCRIPTION OF PROPERTY UNITS
de