ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 420
(3.50)
Splie@oReS-T
COMPLETION REPORT FOR
JOB NO.
AS-BUItT DRAWING NUMBERS ANO OATES:
3V-Ob1
30-68,
6hO - Sh
4/3/51
For:
36-687
4/3/51
36-5138 4/3/51
3G=062
30-063
17-256
30-682
H-683
CONTRACT NO.
“Not for use by A-E
3 April 1951
200 Foot Tower
5 June 1951
Quantity
30-5422,
30-56L1,
3V-5669,
3V-6615.
Construction
Unit
Contract
Cost
Est'd. Value
Gov. Furnished
Material
Engineering
Cost
Totai
30-5423, 30-5430, 30-S4K5, 3V-54L9, 30-5625,
30-5647, 30-5651, 30-5653, 30-565h, 30-5656,
30-5672, 3V-5675, 3V-5676, 36-5677, 3V-5698,
A steel tower
legs horisontally and vertieally eross braced, size 0.D, 20'-08
x 20'-0" x 200'-O* high, erected on 4 reinforced concrete footings, and steel
piling. Kight guy wires from each of 2 levels 75' and 175', to 8 reinforced
conerete guy anchors and messenger cable anchor; tower topped with steel checkered
plate deck upon which is mounted a corrugated sluminum cab with sheet alusiqus
roofing, cab sise 0.D. 20'-0" x 20'-0* x 23'-5" high. A hoist beam extends
above cab. A skip bolet is installed on cutside of tower, the main hoist is
installed inside of tower. Hoiating machinery ia installed on reinforced
concrete bases near base of tower. A steel ladder with guard is attached to
<A water piping system complete with tanks, pumps and piping extends
from base to top of tower. A ventilation fan is installed on roof of cab. A
generator house is a one story, shed roof, wood and corrugated aluminum building,
size O.D. 12'-0" x 12'-0" x 9'~3" mean height, erected on a i" concrete slab
with motor generator and base installed, floor area 11); square feet. A concrete
elab 6" thick x 3'-O" wide x 20'-O" long and a surrounding area 12'-O0* x 26'-08
ie enclosed by a $'-6" high wood fence. Complete with electric wiring and
fixtures including signal lights, obstruction lights, grounding, lightning rods,
telephone and signal cables, and messenger cable. Installed equipment includes:
Qne winch.
PAVING
-
Dwg, 17¥-256
The asphaltic concrete
19
LOCATION & EBERIRU GROUP = SITES "D-V" DATE OF THIS REPORT:
200 FOOT TOMER
tower.
OF
ESTIMATE
30-5139, 30-510, 30-514,
30-5630,
39-5666, 3¥-5667, 39-5668,
3V-46601, 3V¥~6609, 3¥-6610,
W-5626, 36-5627,
AF
Building No.:
DESCRIPTION OF PROPERTY UNITS
Account
Number
AOMON, BIIJIRI, ROJOa,
AF-( 29-| 1-507
The Complete Construction of
6/5/51
"Property
SHEET WO.
6/5/51
around the tower extends to a 1000' radius.
center area to a 1,00' radius is 3" thick, the balances is 1 1/2" thiek.
The
TOTAL = Tower Strusture
TOTAL - Asphalt Paving
Direct
Indirect
$21,7,517.05
200,558.53
$1,262.96
$Lh9,358.5h,
Direct
Indirect
$99,934.87
67,086.41
$1,512.2h
$165 ,533.52
*Proration of
Charges to Units