ATOMIC ENERGY COMMISSION
©sanTA FE OPERATIONS OFFICE
$PO- 436
(3-90)
S eee
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS ANDO DATES:
130-218
JOB NO,
640 - Sr
we
CONTRACT NO,
For:
SHEET NO.
AOMON, BIIJIRI, 20JOa,
_AT=( 29-1)-507
The Complete Construction of
a3
i?
LOCATION & EBERIRU GROUP = SITES "D-V"* DATE OF THIS REPORT:
1 April 19
Causeway Biijiri to Rojoa with Personsel
Bullding No.:
OF
“Not for use by A-E
+
*
.
<
ESTIMATE
"Property
DESCRIPTION OF PROPERTY UNITS
ecount
Quantity
unit
Construction
Contract
Cost
Est'd.
Value
Gov. Furnished|
Material
Engineering
Total
$1,525.92
$215,745.86
Cost
CAUSBMAY BILJIRI TO ROJOA
& wood structure, 20'-0* wide x 190'-i," long, consisting of 43 pile bents, bulkheeds, wing walla and approaches from each shore.
i
.
Each
1
Each
PERCOMIEL
Attached to causeway, a wood structure of pile bente and decking 5'-" wide x
22'-5" long x 6'-9 1/2" high above pile bracing.
Indirect
82, 29b045
*
Proration of
Charges to Units