, ATOMIC ENERGY COMMISSION
dieretieiy: SANTA FE OPERATIONS OFFICE
Fo.
430
(3.501
sweet NO. 22 or 4
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
-6
-
aaah
26-034
Za-by8
Yaa
1/11/51
/
1/1/51
eet
2a-5H9
*Property
Account
JOB NO.
640 = 23
CONTRACT NO, —AT-129-11-507_
For,
Uae
1/11/51
;
The Complete Construction of
Building No.: 89
LOCATION ENIWETOK ISLAND - SITE "a"
.
1 January 19
Base Operations Building and Control Tower
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Number
"Not for use by A-E
DATE OF THIS REPORT:
Quantity
Unit
koe
Construction
Contract
Cost
a
Est'd.
Value
Gov. Furnished
Material
Ena
.
noe
“OS
Total
3 size I.D.
24'-0" x 961-8 1/2" x 10'=0" mean neight with wing 2)'-O" x 76'-8-1/2" x 10'-0"
mean height; anchor bolted to a 5" thick concrete slab; vented window panels;
aluminum partitions; wood counter; electrical wiring and fixtures; plusbing; floor
area O.D. 4,445 square feet; cubic content 42,100 cubic feet.
ment includes: Two water coolers with drinking fountains.
Installed equip-
i
Each
Direct
indirect
$37,256.79
1,455.52
$1,243.76
$39,956.07
CONTROL TOWER
Three story wood and aluminum construction; rectangular shape; size 0.D. 23'-7 1/2"
x 23'-7 1/2" x 27'- 5/8" high; anchor bolted to a 5" thick concrete pad; aluminus
flat sheet roof on 2" x 10" joists with 1" T & G diagonally placed, corrugated
aluminum siding on wood framing up to control room deck; control room walla of
1/4" thick heat tempered glass and flat aluminum sheet on wood framing; aluminum
sash, aluminum louvered door, ventilation hoods; floor of 2" T & G flooring with
3/b" plywood over; wood stairway and handrail; wood handrail and deck on catwalk;
electrical wiring and fixtures; floor area 0.D. 87) square feet; cubic content
Roof exhauster in control roame
1
Each
Direct
$7,325.63
CAL
Uap
“si
5,2h6 cubic feet.
mene
.
Charges toa
—4- -- ek
BAS: OPERATIONS BUILDING - Bldg. #69
Une story, double roof, prefabricated aluminum construction; "L* sh
*p
.
te
mits