ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 43a (3. 504 AS-GUECT GRAWIN >» NUMBERS AND ¥=5651,6 30-5653 5 4/2/51 4/2/51 30-5654,5 4/2/51 36-5656 ,5 3-041 CATES: Number Ria ENIWETOK aTOLL - ee NO 89 or fur use by Aqt GALL OF TRIS REPO: 2 April 1951 ss I; a _— Quantity PROPERTY UNITS ——— beth al tative nev, boatps he Malerial wnat cope fT re | | UCRL aND WRLK REQUIRED COMSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS: | Lun Ad bats Blook House at Cab Base 4/2 51 DESCRIPTION OF — Al-igy-is-bu? ‘urytruction of SHEET “Not _ {AQ fee ne ty vit _ _ lotal BLOCK HOUSE, STATION NO, 131 OM SITE "D -¥* A reinforced lisonite concrete structure, sise 0,D, 12'-6" x 15'=8" x 10'~11" high, erected on a 5'-O0" thick concrete foundation of reinforced coral concrete set on steel piling, 4 pieces 12° dia, x &'-0" long steel pipe sleeves installed in flocr, | & pieces tubing 14% die, x 4'-9" long extended from chamber to 2" above roof, : * Biailding No.: Station Ne, 131 | --- DONTKAC T Nu. Ihe 1é Jo dete) hare Ghamber clogure will be acoomplished by use of limonite concrete cubes, The build- ing ie complete with air conditioning, electrical wiring, fixtures and ducts for instrumentation connections, Chamber sise I,D, 5'-2" x 8'-0"8 x 6'-4* high, limonite slab 30" thick extends from entrance to Station No, 143, A Each Direct $40,536,76 Indirect 15,856.78 Grouting Progrem Lamp Sum Total Station 131 Direct Indirect Direct Indirect $2,206.08 |$58,599,62 10,448.74 13, 398, 26 -0- 23,847 ,00 50,985.50 29,255.04 2,206.08 82,446.62 - Account JOB NU. 729 - 2% 30-5437 4/2/51 “Prope rly }_ 5 el, COMPLETION REPORT FOR “hr ration ot hargjes te Unite

Select target paragraph3