ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3.50)
AS-BuiLT
eS...
COMPLETION REPORT FOR
ORAWIN., NUMBERS
38-5674,
2/15/51
JOW NO.
AND DATES:
CONTRACT NO,
729 = 19
For:
AT-(29-11-507
The Complete Construction of
LOCATION
SHEET no. 68 oF_
"Not for use by A-E
DATE
EMIWBPOK ATOLL
OF
THIS REPORT?
15 February 1951
Collimator Base
Stations 9
Huitding No.:
aETMATE
a
"Property
Account
Number
LESCRIPTION OF
PROPERTY UNITS
Quantity
|construction | Est'd. Value
init
Cont raut
Last
Gov.
7
Furnished
Material
a
ay en
Engineering
Cost
Total
—
MRL, REQUIRED CONSTRUCTION AMD LOCATION OF TRE FOLLOWING STATIONS:
COLLIMATOR BASE, STATION NO, 9 ON SITE "D - ¥*
Retaforeed eonarete base 9'~-D" x 91-0" x 4'-0" below grade, Structural steel
above grade, anahored to bese and
means for edjusting amd clamping
collimatey blogks into proper position, Collimstor bloaks furnished by others,
2
Bach
Direct
Indirect
$4,424.28
3,440, 98
$ 88,27
$7,953.53
5,423,086
3, 252,28
113,56
8,788.92
COLLIMATOR BASE, STATION NO, 9 OM SITE "E®
Reinforced concrete base 9'~O" x 91-08 x 4'<0" below grede,
Structaral steel
above grade, anchored to base and providing means for adjusting and clamping
collimator blooks into proper position, Collimator bloeke furnished by others,
i
Each
Direct
indireat
*Proration of
Charges to units