ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFG-43a
(3-50)
AS-BUILT ORAWING NUMBERS AND DATES:
3-630
eee...
COMPLETION REPORT FOR
JOB NO.
1/31/51
38-056
1/31/51
xa
roe
MaMa
729 - 19
CONTRACT NU, AT-(29-11-507__
For:
LOCATION
sHeet No.
oF.
_
“Not for use by A-E
ENIWETOK aTOLL
DATE
OF
THIS REPORT:
31 January 1951
Tne Complete Construction of Timing
Building No.:
63
Stations No, 6a
ts TIMATE
*proserty|
hewn
Number
OO
LESCRIPTION OF PROPERTY UNITS
TP
Quantity |
unit
Veonstruction |est'a. value| _
Contract
Cost
Gov.
Furnished
Materia!
|
*Proration of
Engineering
Charges to Units
a
M.R,L, REQUIRED CONSTRUCTION aBD LOCATION OF THE FOLLOWING STATIONS:
TIMIBG, STaTICN NO, 6a C8 SITE *c*
An existing structure modified, rehabilitated, and equipped, to be, in effect, a
duplicate of a new atruoture building 6b, Installed equipment includes two dehumidification unite,
1
Fach
Direct
Indirest|
$19,581, 23
10,716.76
$429.55
$30, 727 ¢ 54
17,744,59
6,185, 36
406,12
26, 336,07
TIMING, STATION WO, 6a OW SITE "D ~ V*
An existing structure modified, rehabilitated, and equipped, to be, in effect, a
duplicate of a naw structure building 6b,
hamidification units,
Installed equipment includes two de-
1
Each
Direct
Indirect
TIMING, STATICH MO, Ga OH SITE °E*
An existing sturcture sodified, rehabilitated, and equipped, to be, in effect, a
duplicate of a new strnoture building 6b,
humidification units,
Installed equipment includes two de-
1
Esch
Direct
Indirect;
18 736,74
- 8,467.24
426,78
27 ,630,76