COMPLETION REPORT FOR
.
AG-RUTUL ORAWENG NUMER
FE
=F = WD
LONTRACT NO.
For:
Seer -
AT-1 29-44-07
LOCATION
]
.
KMTWETOK ATOLL
gHeet NO 9Gof |
Not
tor
use
Dy
A-E
DATE OF THiS REPORT:
2 April 1951
The Complete Construction of Pite
tuilding No.: Sations 622, 511, 512, 513, 52L2, 5152, 5162, 5163, 5172, 5173, S17h
Lo TIMATE
"Property
|
ee
ee
Bee
hecant.
Number 4
ee
a
oF: REPTION OF PROPERTY UNITS
wdce ce
Quantity
i
unit
Gonstru. tion
Contrast
Cyt
tst'd.
Value
vov. Furnished
Material
ee
'
co
Fag |neering
a.
Total
08
a
;
CharestOnits
*
ep ee eebf Le
|
| HEDL-4ML- REQUIRED CONSTRUCTION AWD LOCATION OF THE FOLLOWIMG STATIONS:
CONCRETE LINED PIT PANEL, STATION 622,LOCATION "2"
1
|
each
Direct
;
Indirect
|
$
28,82
37.17
$
.30
$
6.29
PIT, STATIONS 511, 512, 513, Tbe, 5152, 5142, 5163, LOCATION "Ef"
|
|
|
'~0" dia. x 4'~0" deep.
7
(
each
Dir eot
Indireot
:
16h, 41
237.92
1.90
ah.23
1.53
341.53
PIT, STATIONS 5172, 5173, Si7h, LOcaTION "3"
L'-0" die. x 4'-0" deep.
3
each
Dir eot
Indirect
148.457
191.53