ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFG. 43a
(3.50)
COMPLETION REPORT FOR
Bonini t o GROWING NIMES es AN,
OATES:
rh NOL
729 = 29
3E-5682.2 - 4/2/51
3E-5155
CONTRACT
for:
~ 4/2/51
Ihe
NOL
AT-4 29-17-5007
Lomplete Construction
* templets
LOCATION
ot Ground
Construction of
Building No.:
Ground
vb oOCRTPTION OF
Number
-
}
'
Rap-¢
|
GRo
,
CONSTRUCTIO
TIO
PROPERTY UNITS
Bot
Oe
Quantity
Unit
F castru tion |]
tettd. val uel
:
Contract
ov. burnished
tngineering
Material
fast
*
Tutal
Each
$20,257.81
15,594.50
$104.29
$35,956.60
112.54
42,612.13
Te SE°
plate for underground entrance sealing, 4" thick steel top cover with orifice,
anchor bolted to structure and surrounded with a 3" thick special stucco at
A-t
2
_
A reinforced concrete structure, size 0.D. 41-10" x 5'-6" x 8'-6" depth, underground bottle station with steel lined cavity, concrete block and steel cover
ground level - coral concrete 7,5 cu. yds.
|
Gb
& reinforced concrete structure, aise O.D. 4'-10" x 5'=6" x 8'-6" depth, under=-
Q
|
PIMA
ground bottle station with steel] lined cavity, concrete block and steal cover
plate for underground entrance sealing, 4" thick steel top cover with orifice,
|
|
!
ti
-y"
Direct
Indirect
|
by
TIO
anchor bolted to structure and surrounded with a 3" thick special stucco at
ground level - coral concrete 7,5 cu. yds.
|
use
2 April 1952
Bottle
Lost
POLLOUL
for
bATE OF THIS RERBRI:
Stations No, 120e through 1200
-
TON
“Nut
ENIWETOK ATOLL
oo
"Property
Autuunt
SHEET no. 35 oF
nein...
|
Each
Direct
Indirect
j
23,518.05
18,961.54
.
Preration of
Charges to Units