ATOMIC ENERGY COMMISSION
“'SARTA FE OPERATIONS OFFICE
eT
COMPLETION REPORT FOR
DRAWING NUM Ef RS
ANDO OATES:
JOB NO,
3B-5617 - e/a
3E-56,2 -
729 = 23
CONTRACT NO.
For:
2/10/51
AT~1 29-1 }-507
LOCATION
sHeet No.
or
"Not for use by A-E
DATE OF
EMIWETOK aTGLL
The Complete Construction of Pig and Dog Cylinders, Heavy Doge Exposure
Burlding No.:
@@
THIS REPORT:
15 February 1951
4
Chambere, and Veutron Hemisphere Locations.
STATIONS 83a and >, She Thru f, 45a Thru f,
ESTIMATE
lt broperty
Accaunt
| OO
;
a
Number
/
DESCRIPTION OF PROPERTY UNITS
-
_
-
Quantity
.
Unit
Construction
Contra, t
_
alte
vane
Ov aterial °
Engineering
Cost
Total
_
MD REQUIRED CONSTRUCTION AND LOCATIONS OF THE POLLOWING STATIONS:
PIG AMD DOG CYLINDER STATIONS 830 and b, ON SITE “Z"
A station consists of 12 reinforced concrete slabs; accurately located, size
13'<0" x 10'-0" x 1'-0" thick, top surface ons inch above grade, for mounting
oylinders furnished by others, total concrete for station 56 oubio yards,
2
each
Direct
Indirect
$9,373.37
7,965.96
$366.89
$17,706.22
$678.76
26.23
1,124.71
21.51
1,108.33
HEAVY DOSE EXPOSURE CHAMBER STATIONS Gle Thru f, ON SITE "Eg"
& concrete slab accurately located, eise 1'-6" z 5'=-0" x 1'-0" level wth and
below grade. Below surface andi protruding 6” from one end of the slab, there
fe a L* dia. 1.P.8. aluminum alloy pipe oapped both ends with standard iron
pipe oape,
6
each
Direot
Indir ect
hig.72
WEUTROW HEMISPHERE LOCATIONS, STATIONS 85a Thru f, ON SITE "5"
Bound hole in ground ,'-0" die. x 4'-0" deep.
installed by H, & I,
Equipment furnished by User anf
MOT
6
each
Dir eot
602.98
Indi reot
783 8;
r
*Proration of
Charges to Unite