@
SFO. 430
(3.50)
AS-BUILT
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
5‘ are,
COMPLETION REPORT FOR
JOB NO. 730.2 - 9g
DRAWING NUMBERS AND DATES:
2/6/51
481351
481352
481353
For:
2/6/51
2/6/51
481354
a
Account
DESCRIPTION OF PROPERTY UNITS
Number
The Complete Construction of Mavy
°
.
”
PT
Quantity
Unit
§
DATE OF THIS REPORT:
6 February 1951
Type Structure
ESTIMATE
Construction
Cont ract
Cost
Est'd.
Value
Gov. Furnished}
Material
-
.
Eogineering
Cost
Total
3.2.3
Concrete and steel test atructures of prefabricated oe1] panels and trusses for
walle and roof, welded, grouted and anchored to fonndation foctings and floor
slab,
Sise of the structures 0,D, 21'-7 5/8" x 41'-7 3/8" x 10'-9 1/4" high,
Building Wo, 3,2,34 - Structure
2
Rach
Direct
Indirect
$35,248 27
10,210, 58
-0-
$45 45885
4,527.85
$2 ,066,79
11,145.78
Direst
Indirect
39,779, 41
14,738 43
2 ,066,79
56,604 63
Direct
Indirect
35,813.55
11,236, 33
-0-
47,049 ,88
Instrumentation
Direct
Indirect
5,616 44
5 263,85
3,086 34
13,966 63
Total Structure and Instrumentation
Direct
Indirect
41,429.99
16,500, 18
3,086, 34
61,016,512
Instrumentation
Total Structure and Instrosentation
Building No, 3,2,3 ~- Structure
Direct
Indirect
4,531.14
CA
*Thre hecumient 5
the Nottomar dis
Seuae-+
or_j8_
"Not for use by A-E
LOCATION ENGEBI ISLAND - SITE "E*®
AT~( 29-1 }-507
Building No.: 3.2.3 8 apd b
2/6/51
"prope rty |
CONTRACT NO.
SHEET NO.
Foatieyer bt
.
;
Cporation of
arges to Units