ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-43 @
(3. 50)
°eee
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
JOB NO. 640
F851 6/9/51
¥8~612 6/11/51
CONTRACT NO. 29-1
For:
ons
The
¢
lete Construction of
ume wompre
Bullding No.:
LOCATION MISCELLANEOUS SITES -
SITES H, J, Ks My Wy P,&2
Camp Sites
15' Photo Towers, Eto.
SHEET Wo._22
or 2@t
“Wot for use by A-E
DATE OF THIS REPORT:
1) June 1951
ESTIMATE
. Property
Account
DESCRIPTION OF PROPERTY UNITS
Blade & Shape, Sites "N", "P", & "Q*
Quantity
39 ,078
Unit
aq. yds.
Direct
Indirect
Blade & Shape Air Strip at Site "K"
1,957
8G. yaa
Direct
Indirect
Asphalt Handling Facilities, Site "H"
1
15' Photo Toweres
1 on ™y*
6
Lot
5,522.01
$187.8
210.42
$50,778.42
33,042.38
Eaoh
Direct
$32,842.29
Direct
Indirect
Engineering
Cost
Totai
23,577+88
$6,111.11
$19,973.52
$258.64,
$686.53
$63,820.80
$357.60
$56,777.77
$463. 52
$58, 76.67
$242.92
$31,924.66
$39 4.6.07
18,
2
1 on "PF"
Direct
$20,851.05
2 on *"Q*
Direct
$38,279.73
Lot
Direct
$57,135.33
Indirec
Est'd, Value
Gove ee
$8, 340.40
Direct
Ind.
Indirect;
2 on *"N*
Construction
Contract
‘10,830.69
For more detail & complete costs see individual site sheets under Scientific
Structures.
Electrical Facilities, Sites "NM", "NH", "P®, & "9" include 10,000 feet of Sub-
marine Cable, 4,000 feet of Buried Cable, 6 Generators, 3 Switchboards, and
5 Portable Generators.
1
Indirect]
$2,145.40
$72,299.64
Water Facilities - No Construction - Engineering Design Only
1
Lot
$1,732.36
$1,732.36
Piers - lo Construction ~ Engineering Design Only
1
Lot
$226.25
$226.25
Rehabilitation of Existing Towers - Sites "J", & "K"
2
_ Bach
Direct
Indirect
13,038.91
tO N
$2 297 oO
3,002.65
informarion affecting)
$5,500.05
*Proration
Charges to of
Units