ATOMIC ENERGY COMMISSION
-. SANTA FE OPERATIONS OFFICE
SFO-43¢
(3. 50)
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
408 NO.
640 - 3e
CONTRACT NO,
For:
AT-( 29-1} 1-507
RET
LOCATION
SHEET WO.
OF
27
DATE OF THiS REPORT:
JAPTAN ISLAND - SITE “L"
The Complete Construction of Animal Quarters, Wash House & Distillation House
Building No.:
10
"Not for use by A-E
18 December 1950
13 and 51
ESTIMATE
frome
"Prope rty
Account
Number
Quantity
DESCRIPTION OF PROPERTY UNITS
Unit
+
ANIMAL
QUARTERS - Bldg.
- Dwg. FS-
Canstruction
Contract
Cost
Est'd. Value
Gov. Furnished
Material
Engineering
cost
a
Total
+
"“Proration of
Charges to Units
-
- 12/18
One story, double roof, prefabricated aluminum construction; rectangular shape;
size I.D. 2h'-O" x khy'-8 1/2" x 10'-O" mean height; anchor bolted to a 5" thick
reinforced concrete slab with curb, slab has provisions for drainage into i'-0"
x b'-O" x 2'-3" concrete sump outside of building; vented window panels; with
electrical wiring and fixtures; exnhauster fan; plusbing; floor area 0.D. 1,155
square feet; cubic content I.D, 10,730 cubic feet; concrete ped, i" thick, in
area way connecting to existing building, sise 12'-O" x 16'-2" - 19) square feet.
Rach
Direct
Indirect
$12,399.23
4,509 9
$67.97
$16,976.69
$201.97
$36,252.36
INSTALLED BQUIPMENT LWCLUDES:
ANIMAL QUARTEHS - Two sinks, 30 cage racks, 2,500 breeding cages, 10,000 indivi-
dual
cages,
2,
and #ix tables.
watering devices, three feed containere, two roof exhausters,
WASH HOUSE ~ One sink, one steriliser, and one rack hoist.
DISTILLATION HOUSE - One boiler, one receiver, one pump assembly, one distilla-
tion
» steam piping system - between boiler and steriliser, condensate and
fresh water piping system, fuel oil piping system - between tank and boiler.
OUTSIDE OF BUILDING #13 - One pump, one water cooler, one fuel oi] tank, one
oh water tank, and one salt water tank.
TOTAL -— Installed Equipment - Animal Quarters
‘SST
Lot
Direct
Indirect
$33,522.39
2,528.00
Ize person is
severe criminal
‘ederal Laws