ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO.43 a
(3. 50)
Selina.
COMPLETION REPORT FOR
AS-BU}LT DRAWING NUMBERS AND DATES:
65-086-3
-
JOB NO. J29 - Bf
5/16/51
CONTRACT NO. 29-1
For:
The Complete Construction of
SHEET NO,”
3
or__
2
*Not for use by A-E”
LOCATION ENGEBI ISLAND - SITE Bf
DATE OF THIS REPORT,
Timing Stations
a
July 1
on
Building No.: Stations 6ef, bof
ESTIMATE
“Property
*ecount
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Construction
Cont ract
Cost
Est'd. Value
Gov. Furnished
Material
Engineering
Cost
Total
TIMING STATIONS, STATIONS 6af, Gbd/, SITE Ef
Existing structures rehabilitated, wiring and power supply modified.
A more
detailed description of these Stations may be obtained by referring to Site "&"
Completion Report. Six transformers are used in conneotion with these stations,
Station 6a
2
each
1
each
Direot
Indirect
Station 6d
1
$5, 517 076
.
$29.33
$5,920 ld
28,17
5,510.64
each
Direct
Indireot
50a
20.76
CAU
+ National | et -1
paamisaton ot Fae
any Manner bo
bhibized aod
*prorati
:
ation of
Charges to Units