ATOMIC ENERGY COMMISSION
@ SANTA FE OPERATIONS OFFICE
SFO. 43 0
(3.30)
COMPLETION REPORT FOR
JOB NO. 6L40 - 61
AS-BUILT DRAWING NUMBERS AND DATES
15-358
CONTRACT NO,
F ° Pr:
6/51
AT-i 29-1 )-507
SodanGeiedanel-—.
LOCATION
SHEET WO.
a
OF. 2)
“Not for use by A-E
EMGEBI [SLAND - SITE “*
DATE OF THIS REPORT:
m lete
Tne e C Complete
Construct|
Distributica
Construction fn of f Tel
Telephone Overhead
Ove
s
6 April 1951
Bullding No.:
ESTIMATE
s Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Cont ract
Est'd. Value
Goverural shed
Engineering
Cost
Total
TELEPHOWE OVERHEAD DISTRIBUTION
Consiste mainly of 3,700 lineal feet (approximately) of overhead lines, 200 feet
of
line, 25 poles and service drops; the switchboard is located in
Scientific Station lo. 69, where connections are made to various islanis by
subsearine cable.
1
Eagh
Direct
Indirect
$13,242.21
4,820.68
$368.20
$15,451.09
ory
the]
traq
Ba
In @
pra
"
>
*Proratlon
of
Charges to Units