SFO.43 @
(3. 60}
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
5-167
135-207
JOB NO. 640 = 6a,b,0,d
2/13/81
CONTRACT NO. AT-(29-1)-507__
For:
Sine
SHEET NO.
Buliding No.:
23
“Not for use by A-E
LOCATION EMGERI ISLAND ~ SITE *B*
The Complete Construction of Building Location Plan, Site Preperation,
4/6/51
16 _. OF,
DATE OF THIS REPORT: 6
april] 19K.
Ap
and Grading & Paving Roads & Airstrip
ESTIMATE
. Property
account
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Est'd.
Value
Gov.Furn ' shed
Engi
i
"9 Cost. ng
Total
SITE PREPARATION
Tae camp ares, approximately 700 ft. z 1,600 ft., hes located therein all the
permanent, temporary and existing structures required. The balance of site
preperation extends to all sections of the ialend.
185,356 Sq. da
Direct
Indirect|
$25,033.02
18,342-66
$52h.67
$43,919.35
$45.39
$33,913.28
ROADS
Both paved end unpeved (exclusive of temporary sonstruction roads) amounts to
approximately 12,000 lineal feet of 20' roadway.
pered with 3" asphaltic conorete.
2,700 feet of this road is
Biade & Shape
26, 700
Sq. Ide.
Direct
Indirect
Asphalt Surfacing
6,000 Sq. Ids.
Direct
Indirect
$19,321.15
14,143. 7h
$6,633.58
he, Th .09
$11,378.67
ATRSTRIP
The airstrip, a 100' wide x 2,680' long, graded, crowed, stabilised, and
bitumals sprinkled, runway exteuia in an easterly direction to the ocean.
6,780
Sqe Yee.
Direct
Indirect
MOTE:
$3,864.36
2,634.56
Zero paving, called for on the above drawings, is aocounted for on Tower
"Kaport.
a
Nee
$61.00
$6,779.92
"Proratl
f
Charges toUni ts