ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
JOB NO. 640 = 6e
AS-BUILT ORAWING NUMBERS AND DATES:
FS~226
CONTRACT NO.
For;
2/l/Si
AT-( 29-1 )-507
SHEET NO.
S eee:
3
or_23
"Not for use by A-E
LOCATION ENGEBI ISLAND - SITE *E*
DATE OF THIS REPORT:
The Complete Construction of Meld Laboratory
1 February 1951"
Building No.:
ESTIMATE
on
"Property
Account
Number
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
—
Canstruction
Contract
Cost
Est'd. Value
bov. Furnished
Material
Engineering
Cost
Total
FIELD LABORATORY
One story wood, aluminum, and steel building; rectangular ahape; sise 0.D. 20'.0"
x ip'-0" x 13'-O" high; set on a 5" thick concrete slab; corrugated elusinun
roofing on 2° x 6" rafters and 1" x 6" purlins; walle of 2" x 6" wood
with corrugated steel siding; screened openings at each end, '-O" wide, 3'-0"
from floors plywood partition 3'-6" high; screened doors; electrical wiring and
figtares; piping; benches; floor area 0.D. 800 square feet; cubic content 7,763
cubic feet.
Installed equipment includes:
Two sinks, two scales, one salinity
tester, ons hydraulic test machine, one hot plate, one cement measure, one muffled
furnace, one torsion balance, one indicator, one drying oven, one sani shaker,
one laboratory still, one oube mold, one compaction kit, one drafting stool, ons
testing kit, one platimm crucible, one cook stove, one drafting machine, one
calculator, one typewriter, and one pneusatic drill.
Direct
$3,996.82
3,167.19
$56.75
$7,220.76
- document
P National t?
TaN ot
any anber
Dhibiated ane
halties und)
"Proration of
Charges to Units